My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-039B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-039B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2015 10:43:05 AM
Creation date
10/1/2015 5:15:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/19/2013
Control Number
2013-039B
Agenda Item Number
8.H.
Entity Name
Andrew Sitework of Ft. Myers, Fl.
Subject
Vero Shores Pump Station No. 143 Force Main Replacement
Area
East of Young's Market FEC Railway to Old Dixie
Bid Number
2013019
Supplemental fields
SmeadsoftID
11872
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Local Government Prompt Payment Act. In such, event, payment and retainage provisions <br /> shall be governed by the applicable grant requirements and guidelines . <br /> ARTICLE 6 FINAL PAYMENT <br /> 6 . 1 . Acceptance And Final Payment : Upon receipt of written notice that the work is ready <br /> for final inspection and acceptance , the ENGINEER will promptly make such inspection and when <br /> the ENGINEER finds the work acceptable under the terms of the Contract and the Contract fully <br /> performed , the ENGINEER will promptly issue a final completion certificate stating that the work <br /> provided for in this Contract has been completed , and acceptance by the OWNER under the terms <br /> and the conditions thereof is recommended and the entire balance found to be due the <br /> CONTRACTOR , will be paid to the CONTRACTOR by the OWNER following County Commission <br /> approval of the final Contract payment . <br /> 6 . 2 . Acceptance of Final Payment as Release . The acceptance by the CONTRACTOR of <br /> final payment shall be and shall operate as a release to the OWNER from all claims and all liability <br /> to the CONTRACTOR other than claims in stated amounts as may be specifically excepted by the <br /> CONTRACTOR for all things done or furnished in connection with the work under this Contract <br /> and for every act and neglect of the OWNER and others relating to or arising out of the work . Any <br /> payment, however, final or otherwise , shall not release the CONTRACTOR or its sureties from any <br /> obligations under the Contract Documents or the Payment and Performance Bonds . <br /> ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br /> 7 . 1 . In order to induce OWNER to enter into this Agreement , CONTRACTOR makes the <br /> following representations : <br /> 7 . 1 . 1 . CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents , work, site , locality, and all local conditions and laws and regulations that in any manner <br /> may affect cost, progress , performance or furnishing of the work. <br /> 7 . 1 . 2 . CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary Conditions <br /> as provided in Paragraph 4 . 02 of the General Conditions , and accepts the determination set forth in <br /> Paragraph SC4 . 02 of the Supplementary Conditions of the extent of the technical data contained in <br /> such reports and drawings upon which CONTRACTOR is entitled to rely . <br /> 7 . 1 . 3 . CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying) all such examinations , investigations , explorations , tests , reports <br /> and studies (in addition to or to supplement those referred to in Paragraph 7 . 2 above) which pertain <br /> to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, <br /> progress , performance or furnishing of the work as CONTRACTOR considers necessary for the <br /> performance of furnishing of the work at the Contract Price , within the Contract Time and in <br /> accordance with the other terms and conditions of the Contract Documents , including specifically the <br /> provisions of Paragraph 4 . 02 of the General Conditions , and no additional examinations , <br /> investigations , explorations , tests , reports , studies or similar information or data are or will be <br /> required by CONTRACTOR for such purposes . <br /> 7. 1 .4 . CONTRACTOR has reviewed and checked all information and data shown or indicated <br /> on the Contract Documents with respect to existing underground facilities at or contiguous to the site <br /> and assumes responsibility for the accurate location of said underground facilities . No additional <br /> 00530=4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.