Laserfiche WebLink
ATM Other <br /> Total Subcontractor lwl ATM ATM Total Direct costs Total Task <br /> Principal Senior 510fl EngMetlnq ATM ATM ATM ATM ATM Field <br /> Task Desai tion and Breakdown coastal Dnhingl CEG CSA tricks" EAI M6E Subcontractor Marker Labor <br /> (00C.51 AL Budget <br /> P Engineer Engineer Technician Surveyor Clerical Biologist Biologist PI <br /> Engineer AutoLAO (raw) Equipment <br /> 8170 51]0 $120 E100 5120 $9595 5115 S105 <br /> Task 1 Biological Monitoring <br /> 1 Billo kal Mordonn 8 64 i6 24 $8,200 $159.680 $167,880 $ 176,274 $13080 $654 <br /> $ 190.008 <br /> Total Cost - Task 1 8 64 0 16 0 0 24 0 0 $8,200 $159,680 $U $o $0 $ 167,880 <br /> $176,214 $1 ],080 S654 $190008 <br /> ToUl TaskOrder UoSts 8 6d 0 16 0 0 24 D 0 56,2DD $159 680 So SO $D $167,880 <br /> 5176,274 $13,080 $654 $190,000 <br />