My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-122
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 11:51:27 AM
Creation date
10/1/2015 2:13:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2010
Control Number
2010-122
Agenda Item Number
12.I.2
Entity Name
Applied Technology and Management
Subject
Sector 7 Beach Restoration
Work Order No. 17
Supplemental fields
SmeadsoftID
9685
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3 Beach Profile Survey <br /> Morgan & Eklund will perform the beach profile survey data collection and data reduction . Beach <br /> profiles will include R -94 through R - 112 including half stations from R -99 to R - 101 and from R - 106 <br /> to R - 108 and quarterly stations between R - 101 and R - 106 . All data collected will be accordance <br /> with the DEP -approved Physical Monitoring Plan . ATM will review the provide necessary project <br /> coordination with the Morgan & Eklund , provide the County with beach profile data in ASCII file <br /> format , CAD drawings , and drawings ( 11x17 format) signed by the surveyor. <br /> Task 4 Physical Monitoring Report <br /> ATM will analyze the data and prepare a physical monitoring report per the DEP -approved <br /> Physical Monitoring Plan . The report will include reporting of the pre -and post-construction <br /> surveys of the beach profiles and borrow site . ATM will analyze the data for placed sand , <br /> shoreline and volume changes and the post- project condition of the borrow site . ATM will provide <br /> the FDEP with aerial photography ( rectified and geo - referenced under a separate work order) . <br /> ATM will prepare the 3rd Year Post-Construction Physical Monitoring Report as necessary . The <br /> County will provide ATM with comments to a draft version , and ATM will distribute the report as <br /> necessary . <br /> ATM will provide the County with one draft report for review , and distribute final copies to the <br /> County and regulatory agencies . <br /> Task 5 Agency Coordination and Project Administration <br /> Under this task , ATM will coordinate with federal and state regulatory agencies on key project <br /> issues and overall satisfaction of permit- required submittals . Quality control and quality <br /> assurance will ensure that all submittals and agency coordination meet ATM ' s and the County ' s <br /> standards for reporting . All documents will be peer- reviewed internally by ATM staff, and provided <br /> to the County for comment. <br /> Future Tasks <br /> The issued FDEP and USACE permits require biological monitoring of the project for one <br /> additional year and biennial physical monitoring for the remainder of the project design life . It is <br /> assumed that the monitoring requirements will not change ; however, ATM will seek waivers to the <br /> monitoring requirements where appropriate . <br />
The URL can be used to link to this page
Your browser does not support the video tag.