Laserfiche WebLink
Task 3 Beach Profile Survey <br /> Morgan & Eklund will perform the beach profile survey data collection and data reduction . Beach <br /> profiles will include R -94 through R - 112 including half stations from R -99 to R - 101 and from R - 106 <br /> to R - 108 and quarterly stations between R - 101 and R - 106 . All data collected will be accordance <br /> with the DEP -approved Physical Monitoring Plan . ATM will review the provide necessary project <br /> coordination with the Morgan & Eklund , provide the County with beach profile data in ASCII file <br /> format , CAD drawings , and drawings ( 11x17 format) signed by the surveyor. <br /> Task 4 Physical Monitoring Report <br /> ATM will analyze the data and prepare a physical monitoring report per the DEP -approved <br /> Physical Monitoring Plan . The report will include reporting of the pre -and post-construction <br /> surveys of the beach profiles and borrow site . ATM will analyze the data for placed sand , <br /> shoreline and volume changes and the post- project condition of the borrow site . ATM will provide <br /> the FDEP with aerial photography ( rectified and geo - referenced under a separate work order) . <br /> ATM will prepare the 3rd Year Post-Construction Physical Monitoring Report as necessary . The <br /> County will provide ATM with comments to a draft version , and ATM will distribute the report as <br /> necessary . <br /> ATM will provide the County with one draft report for review , and distribute final copies to the <br /> County and regulatory agencies . <br /> Task 5 Agency Coordination and Project Administration <br /> Under this task , ATM will coordinate with federal and state regulatory agencies on key project <br /> issues and overall satisfaction of permit- required submittals . Quality control and quality <br /> assurance will ensure that all submittals and agency coordination meet ATM ' s and the County ' s <br /> standards for reporting . All documents will be peer- reviewed internally by ATM staff, and provided <br /> to the County for comment. <br /> Future Tasks <br /> The issued FDEP and USACE permits require biological monitoring of the project for one <br /> additional year and biennial physical monitoring for the remainder of the project design life . It is <br /> assumed that the monitoring requirements will not change ; however, ATM will seek waivers to the <br /> monitoring requirements where appropriate . <br />