Laserfiche WebLink
Plans for the construction of storm water detention areas will be prepared . The detention <br /> area plans will include an overall pond layout sheet and individual pond plan, elevations <br /> and details . Hydraulic calculations will be performed in order to size the ponds and as <br /> required for permitting of the project. <br /> A subsurface geotechnical exploration program will be conducted by Tierra South <br /> Florida . A total of 22 SPT borings will be drilled to a depth of 20 -feet within the pond <br /> areas . A report on the results of the boring program will be prepared . <br /> Permitting <br /> Permit application packages have been prepared and submitted to the following agencies : <br /> • SJRWMD — drainage permit <br /> • IRFWCD — drainage permit <br /> To date , ARCADIS has paid the following fees to regulatory permit agencies for this <br /> project : <br /> • St . Johns River Water Management District - $ 1 , 000 . 00 <br /> • Indian River Farms Water Control District - $350 . 00 <br /> Plans <br /> The following plan sheets will be prepared : <br /> 1 . Overall Pond Layout sheet <br /> 2 . Pond plans <br /> 3 . Storm Water Pollution Prevention Plans <br /> The plans will be prepared based upon English units . <br /> " SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following : <br /> ARCADIS will prepare 90% , and 100% plans for the improvements . <br /> E . The Roadway set of plans shall consist of the following : <br /> 30 % 60 % 90 % 100 % <br /> Cover Sheet X <br /> Typical Sections X <br /> Summary of Quantities and General Notes X <br /> Summary of Drainage Structures Sheets X <br /> Details X <br /> Plan and Profile Sheets (40 scale) X <br /> C Oocuments and Settings\hdeibel\L.ocal Settings\Temporary Internet Files\Content.Outlook\41YHPOTT\43RD AVE AMENDMENT 2 1 - 10- <br /> 10 .doc <br />