Laserfiche WebLink
from 26th Street to north of 57th Street . These plans included the construction of water main and <br /> reuse water main improvements on the intersecting side streets . This work was shown on the <br /> roadway plans and separate utility plans . <br /> The County has determined that the construction of the 20" water main will no longer be <br /> included in the project . The utility improvements will be limited to the construction of <br /> connections to the existing water mains on the intersecting side streets . The water main will be <br /> shown to be constructed from the existing water main connections on the east side of the <br /> IRFWCD Lateral A Canal , and will extend west across the proposed bridges crossing the Lateral <br /> A Canal . The water mains will then be extended west across 66th Avenue where they will <br /> terminate at a fire hydrant . The extension of reuse water main lines from the existing reuse line <br /> on the east side of 66th Avenue to the west side of 66th Avenue will be provided . In addition, the <br /> plans currently show the existing reuse water main to be deflected under the proposed 60" <br /> diameter culverts for the sub -lateral canals at each sidestreet location . Due to modifications of the <br /> size and invert elevations of the canal culverts , the reuse main may be able to cross over the canal <br /> culverts . These crossings will be reviewed and revised so as to provide for the reuse lines to be <br /> deflected over the canal culverts wherever possible . <br /> The revised water main and reuse line improvements will be shown on the roadway plans from <br /> SR 60 to 500 ' north of 49th Street . The roadway plans will be revised to eliminate the proposed <br /> 20 " water main as currently shown on the plans , profiles , and drainage structure sheets . The <br /> revised utility lines crossing 66th Avenue will be detailed on the roadway plan sheets . Separate <br /> utility quantities will be included in the roadway plans . The roadway plans for 66th Avenue from <br /> 500 ' north of 491h Street to north of 57th Street will not be revised at this time . <br /> A right turn lane will be added to the plans at the entrance to the Trillium subdivision . The right <br /> turn lane will be approximately 200 feet long with a 50400t taper. The roadway plans , cross <br /> sections , and pavement marking plans will be revised to include the right turn lane . The estimate <br /> of quantities will be revised as necessary to include the turn lane construction . <br /> Landscape and irrigation plans have been prepared for the project . The irrigation plans were <br /> based on utilizing re- use water for the irrigation supply in accordance with St. John ' s River <br /> Water management guidelines . After the irrigation plans were completed the County utilities <br /> department advised that the re-use water line would not have constant pressure, and that the time <br /> periods when re- use water would be available for use as irrigation supply could not be regularly <br /> established . Based on this it was determined that the irrigation plans should be revised to utilized <br /> groundwater wells as the supply source rather than the re-use water. <br /> " SECTION V — COMPENSATION " is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> Page 2 of 5 <br /> G : ALNR Support\ADMIN\Marketing\ProposalsyWPB \2011 \66 th Ave Amendment No 10 1 -23 - 12 . doc <br />