My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-110
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:50:16 AM
Creation date
10/1/2015 5:20:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/18/2013
Control Number
2013-110
Agenda Item Number
8.L.
Entity Name
Arcadis US, Inc.
Subject
Bridge Replacements and Widening 66th Avenue
Amendment No. 13
Area
66th Ave. South of SR60 to North 57th Street
Project Number
0545
Supplemental fields
SmeadsoftID
11957
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� o to Ito <br /> BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE <br /> FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET <br /> IRC PROJECT NUMBER 0545 <br /> 1 <br /> PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING <br /> AND LAND SURVEYING SERVICES <br /> AMENDMENT NO* 13 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br /> SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. AND INDIAN RIVER <br /> COUNTY, FLORIDA. <br /> This is an amendment to the existing Engneering/Land Surveying Services Agreement <br /> (AGREEMENT) dated September 6, 2005 between ARCADIS US, Inc. (ENGINEER) and <br /> Indian River .County (COUNTY). This amendment addresses changes in " Section I — Project <br /> Limits and Description" and " Section V - Compensation" . <br /> Amendment Description <br /> This Amendment includes the following. <br /> " SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to mncorporate <br /> the following. <br /> Plans have been prepared for the construction of 6e Avenue from south of SR 60 to north of <br /> 57u' Street. Included in theproject is the construction of a 12 inch diameter water main on 33. d <br /> Street. Also included . is the construction of water main and reuse water main crossings at 33' <br /> Street, 37`x' Street, 45th Street, and 49th Street, and the relocation of an existing force main at 33rd <br /> Street. The COUNTY has requested that the. ENGINEER revise the plans to extend the water <br /> main construction on 33' d Street an additional 500 feet to the 'west,-and provide a final <br /> certification_for these facilities to FDEP upon completion of the construction. <br /> In order to provide the construction completion certification, the ENGINEER will perform <br /> periodic inspections of the progress of the work. it is our understanding that the COUNTY will <br /> perform daily inspections of the contractor' s operations to confirm that the utility lines are <br /> constructed in accordance with COUNTY standards. The ENGINEER will perform site <br /> inspections on a weekly basis during the installation of the utility lines to observe the contractors <br /> operations and confirm that the utility improvements are constructed in accordance with the <br /> project plans. In addition, the ENGINEER will attend construction progress meetings as <br /> requested by the COUNTY, and will provide engineering services Ion an as requested basis <br /> during construction to address questions and requests for additional information and to address <br /> unforeseen construction issues that may arise. The estimated hourly not to exceed fee included in <br /> this supplement is based on providing professional engineering services for six hours per week <br /> (two site visits per week) during a 16 week construction time period ( 16 hours Project <br /> Engineering Manager & 96 , hours Sr. Field Coordinator). Additional time is included for the <br /> Page l of'4 <br /> G:\INR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 13 5-3043 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.