Laserfiche WebLink
� o to Ito <br /> BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE <br /> FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET <br /> IRC PROJECT NUMBER 0545 <br /> 1 <br /> PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING <br /> AND LAND SURVEYING SERVICES <br /> AMENDMENT NO* 13 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br /> SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. AND INDIAN RIVER <br /> COUNTY, FLORIDA. <br /> This is an amendment to the existing Engneering/Land Surveying Services Agreement <br /> (AGREEMENT) dated September 6, 2005 between ARCADIS US, Inc. (ENGINEER) and <br /> Indian River .County (COUNTY). This amendment addresses changes in " Section I — Project <br /> Limits and Description" and " Section V - Compensation" . <br /> Amendment Description <br /> This Amendment includes the following. <br /> " SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to mncorporate <br /> the following. <br /> Plans have been prepared for the construction of 6e Avenue from south of SR 60 to north of <br /> 57u' Street. Included in theproject is the construction of a 12 inch diameter water main on 33. d <br /> Street. Also included . is the construction of water main and reuse water main crossings at 33' <br /> Street, 37`x' Street, 45th Street, and 49th Street, and the relocation of an existing force main at 33rd <br /> Street. The COUNTY has requested that the. ENGINEER revise the plans to extend the water <br /> main construction on 33' d Street an additional 500 feet to the 'west,-and provide a final <br /> certification_for these facilities to FDEP upon completion of the construction. <br /> In order to provide the construction completion certification, the ENGINEER will perform <br /> periodic inspections of the progress of the work. it is our understanding that the COUNTY will <br /> perform daily inspections of the contractor' s operations to confirm that the utility lines are <br /> constructed in accordance with COUNTY standards. The ENGINEER will perform site <br /> inspections on a weekly basis during the installation of the utility lines to observe the contractors <br /> operations and confirm that the utility improvements are constructed in accordance with the <br /> project plans. In addition, the ENGINEER will attend construction progress meetings as <br /> requested by the COUNTY, and will provide engineering services Ion an as requested basis <br /> during construction to address questions and requests for additional information and to address <br /> unforeseen construction issues that may arise. The estimated hourly not to exceed fee included in <br /> this supplement is based on providing professional engineering services for six hours per week <br /> (two site visits per week) during a 16 week construction time period ( 16 hours Project <br /> Engineering Manager & 96 , hours Sr. Field Coordinator). Additional time is included for the <br /> Page l of'4 <br /> G:\INR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 13 5-3043 .doc <br />