My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-110
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:50:16 AM
Creation date
10/1/2015 5:20:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/18/2013
Control Number
2013-110
Agenda Item Number
8.L.
Entity Name
Arcadis US, Inc.
Subject
Bridge Replacements and Widening 66th Avenue
Amendment No. 13
Area
66th Ave. South of SR60 to North 57th Street
Project Number
0545
Supplemental fields
SmeadsoftID
11957
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Main Plans (ARCADIS) ... ................ ...... ... .. ....................... $0. 00 $86,145.00 <br /> (Lump Sum) <br /> Corridor Study (ARCADIS).......:......0.000....,..,..,.,.............»;.......,.... $0. 00 $15,58Z00 <br /> Cultural Resource Assessment ........ ....... ... 0000.:;:....,«,. . ..:.....«..: $0. 00 $8, 925. 93 <br /> I IF <br /> TOTAL PROFESSIONAL SERVICES,...,,,,».............. ................. $0. 00. $2,019, 69809 <br /> HOURLY RATE ALLOWANCES' <br /> Allowance for Sketch and Legal <br /> Descriptions and staking of parcels (3.75. 00/each) ................ NTE MOO $51,000. 00 <br /> Allowance for miscellaneous roadway design <br /> I <br /> due to right of way negotiations ............................... NTE $0. 00 $20200000 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey $112/Hr) ............................................... ....................... NTE $000 $209000. 00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project0.00..0.0.000.0.0.000.0.000...00000...0,0,...0... NTE $0. 00 $27,000.00 <br /> Construction Engineering Services - Public Works .... NTE $209000900 $77987712 <br /> Construction. Engineering Services-Utility Dept ......... NTE $10,44624 $10,44624 <br /> TOTAL HOURLY RATE ALLOWANCES.,0.0.00.........0. NTE $30,44624 $2060323:36' <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below: <br /> Project Engineer Manager..00...0.0.00..0. 0....0...0„.0.000.0..000000 $I46 64 <br /> Project Engineer ............................................................... $109. 70 ' <br /> IF <br /> Senior CADD Operator .........000..0000.00.........,00.................. .. $85984 <br /> CaddDraftsman....... 0....... 0«0..... 000..........0 .00.....0.000..000.. $5689 <br /> Survey ProjectManages.:...... .:......:. . 0 ........,................ $106*40 <br /> Professional ,Surveyor. «0..»«..01 .....:,,..0......... «....... .....0«. $9830 <br /> . <br /> Survey CADD Tech ...........................»,.........,....««,..........».,, $68. 17 <br /> 3 Man Field Crew....... .......... ......:...«.......«1 :.,..0. .......: $12684 <br /> 2 Man Field Crew,....«......»..............00.......«, ...,.«.0 ,.«.,..00, $114014 <br /> Sr. Field Coordinator ... .................................................. $ 75000 <br /> Page 3 of 4 <br /> G:\LNR Support\ADMIN\Marketing\Proposals\WPB\20I3\66 th. Ave Amendment No ' 3 5-3043 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.