Laserfiche WebLink
BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE <br /> FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET <br /> IRC PROJECT NUMBER 0545 <br /> PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING <br /> AND LAND SURVEYING SERVICES <br /> AMENDMENT NO. 14 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br /> SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. AND INDIAN RIVER <br /> COUNTY, FLORIDA. <br /> This is an amendment to the existing Engineering/Land Surveying Services Agreement <br /> (AGREEMENT) dated September 6 , 2005 between ARCADIS US , Inc . (ENGINEER) and <br /> Indian River County (COUNTY) . This amendment addresses changes in " Section I — Project <br /> Limits and Description" and " Section V - Compensation " . <br /> Amendment Description <br /> This Amendment includes the following : <br /> " SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate <br /> the following : <br /> Plans have been prepared for the construction of 66�" Avenue from south of SR 60 to north of <br /> 57'' Street . Included in this work are plans for the widening and reconstruction of 49h Street <br /> from 66th Avenue to a point approximately 1 , 180 feet east of 66th Avenue. These plans included a <br /> roadway transition from the ultimate three lane section to matching the existing roadway width <br /> and location east of 66`x' Avenue. These plans will be revised to show the three lane section at <br /> 66`x' Avenue transitioning to an ultimate two lane roadway section for total a distance of 1 , 3 90 <br /> feet east of 66b Avenue. The plans will be revised to provide for two 12 - foot wide travel lanes <br /> with 4- foot wide paved shoulders . The south edge of pavement will be located 184eet north of <br /> the sub-lateral A- 8 canal north right of way line. The roadway plans , cross sections, and <br /> pavement marking plans will be revised to reflect the new pavement width and location. <br /> " SECTION IV — TIME FOR COMPLETION" is being modified to incorporate the <br /> following : <br /> The time for completion of Amendment Number 14 shall run concurrently with the construction <br /> of this project. <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following : <br /> Page 1 of 4 <br /> G : \LNR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 14 & 19- 13 . doc <br />