My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-170
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 11:17:26 AM
Creation date
10/1/2015 5:33:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/10/2013
Control Number
2013-170
Agenda Item Number
8.J.
Entity Name
Arcadis US, Inc.
Subject
Amendment No. 14 Bridge Replacements
Widening of 66th Ave.
Area
South of SR 60 north of 57th Street
Supplemental fields
SmeadsoftID
12257
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE <br /> FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET <br /> IRC PROJECT NUMBER 0545 <br /> PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING <br /> AND LAND SURVEYING SERVICES <br /> AMENDMENT NO. 14 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br /> SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. AND INDIAN RIVER <br /> COUNTY, FLORIDA. <br /> This is an amendment to the existing Engineering/Land Surveying Services Agreement <br /> (AGREEMENT) dated September 6 , 2005 between ARCADIS US , Inc . (ENGINEER) and <br /> Indian River County (COUNTY) . This amendment addresses changes in " Section I — Project <br /> Limits and Description" and " Section V - Compensation " . <br /> Amendment Description <br /> This Amendment includes the following : <br /> " SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate <br /> the following : <br /> Plans have been prepared for the construction of 66�" Avenue from south of SR 60 to north of <br /> 57'' Street . Included in this work are plans for the widening and reconstruction of 49h Street <br /> from 66th Avenue to a point approximately 1 , 180 feet east of 66th Avenue. These plans included a <br /> roadway transition from the ultimate three lane section to matching the existing roadway width <br /> and location east of 66`x' Avenue. These plans will be revised to show the three lane section at <br /> 66`x' Avenue transitioning to an ultimate two lane roadway section for total a distance of 1 , 3 90 <br /> feet east of 66b Avenue. The plans will be revised to provide for two 12 - foot wide travel lanes <br /> with 4- foot wide paved shoulders . The south edge of pavement will be located 184eet north of <br /> the sub-lateral A- 8 canal north right of way line. The roadway plans , cross sections, and <br /> pavement marking plans will be revised to reflect the new pavement width and location. <br /> " SECTION IV — TIME FOR COMPLETION" is being modified to incorporate the <br /> following : <br /> The time for completion of Amendment Number 14 shall run concurrently with the construction <br /> of this project. <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following : <br /> Page 1 of 4 <br /> G : \LNR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 14 & 19- 13 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.