Laserfiche WebLink
PCA - Intersection of SR 60 and 43`d Avenue - 3 - <br /> Ardaman Proposal No. 12-3836 <br /> after additional data is gathered relative to groundwater levels and subsurface stratigraphy. The <br /> proposed shallow wells will be constructed of 2-inch diameter, 0 . 01 -inch slotted schedule . 40 PVC <br /> pipe . A summary of the proposed number and approximate location of the wells is provided in <br /> the following table . <br /> site Address (PrdArnky toAn ' Mterseddon) - ProAI posed Number and Location of WellsAn <br /> In Ann <br /> Mark's Mobil 4310 20"' Street (Northwest Comer) Two along 43rd Avenue and two along 20` ' Street <br /> Former Texaco / Lenny's Lounge 4315 20"' Street (Southwest Comer) Two along 43rd Avenue and one along 20'" Street <br /> Former FINA #6644/Mobil 4395 20'" Street (200 Feet West) Two along 20"' Street <br /> Former Union 76 4233 20"' Street (Southeast Comer) Two along 43rd Avenue and one along 20"' Street <br /> Cumberland Farms 1925 43rdAvenue (500 Feet South) Two along 43rdAvenue <br /> Indian River Farms WCD 4400 20'hStreet (Northwest Comer) One along 43rdAvenue and two along 20'" Street <br /> Quick Snack and Coin Laundry 4236 20'" Street (Northeast Comer) Two along 43rd Avenue and one along 20'hStreet <br /> Mermaid Car Wash 1935 43rdAvenue (450 Feet South) One along 43rd Avenue <br /> Strip Shopping Center 4201 - 4211 20"' Street (200 Feet East) One along 20"' Street <br /> (Vero Beach Dry Cleaners <br /> We note that permanent groundwater monitoring wells are not being proposed at this time since <br /> the locations will likely be disrupted during construction activities. Additional permanent <br /> groundwater monitoring wells may be proposed to monitor groundwater contamination levels and <br /> migration during construction if deemed appropriate based on the results of the PCA. <br /> C . Groundwater Sample Collection and Analysis <br /> Groundwater samples obtained from the wells will be collected for laboratory analysis in <br /> accordance with FDEP sampling requirements . Groundwater samples collected from the wells <br /> will be submitted to a State certified laboratory for analysis by EPA Methods 8021 and 8270, and <br /> the FL- PRO method . <br /> 11. Preliminary Contamination Assessment Report (PCAR) <br /> A report summarizing the above preliminary site assessment activities will be submitted upon <br /> completion of the above-described scope of work. Details , descriptions and rationales for the <br /> various site assessment activities will be presented , along with all data developed during the <br /> assessment activities . The report will include the results of our findings relative to any identified <br /> soil and/or groundwater contamination within the study area that may present limitations or <br /> require special monitoring of contaminated media during construction of the proposed <br /> intersection widening project. <br /> COST ESTIMATE <br /> This proposal contains general methodology and procedures for conducting a limited PCAR for the <br /> subject site . The quantity of items contained in this plan may vary depending on the findings <br /> during performance of the assessment (e .g . ; number of samples and wells, depths of monitoring <br /> wells , etc. ) . Consulting fees will be charged on a time and materials basis using the unit prices <br /> listed in this proposal . We have prepared the attached cost estimate for completing the scope of <br /> work as outlined above . The cost for these services will not exceed $60,748 . 50 without prior <br /> approval from the client. <br />