My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-017
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 10:43:09 AM
Creation date
10/1/2015 5:06:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2013
Control Number
2013-017
Agenda Item Number
8.D.
Entity Name
Ardaman and Associates
Subject
Intersection Improvements
Quality Control
Area
43rd Avenue and SR 60 Intersection 18th Street to 26th Street
Project Number
0853
Supplemental fields
SmeadsoftID
11702
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: Indian River County <br /> PROJECT: Intersection of State Road 60 (20th Street) and 43rd Avenue, Vero Beach, Florida <br /> DESCRIPTION: Preliminary Contamination Assessment <br /> TOTAL PROJECT COST: $60,748.50 <br /> NUMBE COST PER NUMBECOST PER <br /> ITEM DESCRIPTION UNITS UNITS UNIT EXTENSION ITEM DESCRIPTION UNITS UNITS UNfT MEXTENSIONPERSONNEL GENER <br />AL FIELD EQUIPMENT AND EXPENDABLES <br /> Principal Engineer Per Hour $165.00 Data Logger Per Day $390.00 <br /> Senior Project Manager Per Hour 4 $135.00 $540.00 Organic Vapor Analyzer (Fti) o PID) Per Day 7 $164.00Project Manager <br /> Per Hour $135.00 Generator Per Day 1 $95.00 <br /> Senior Project Engineer/Geologist Per Hour 80 $115.00 $9,200.00 Pressure Washer Per Day $190.00 <br /> Project Engineer/Geologist III Per Hour $95.00 Surveying Equipment (Water Table Elevs) Per Day $78.00 <br /> Project Engineer/Geologist I Per Hour $95.00 Centrifugal Development Pump Per Day $61 .00 <br /> Assistant Project EngineedGeologist Per Hour $85.00 I Submersible Development Pump Per Day $250.00 <br /> Senior Field Tedvidan IV Per Hour 80 1 $52.00 $4*1604001 Peristaltic Purging Pump Per Day 7 $40.00 $280. <br /> Field Technician III Per Hour 40 $52.00 $2,080.00 Magnetometer Per Day $62.00 <br /> Field Technician II Per Hour $44.00 Water Level Indicator Per Day 7 $20.00 $140. <br /> Senior Technical Draftsmen Per Hour 12 $52.00 $624.00 Product/Water Interface Probe Per Day $82.00 <br /> Technical Draftsmen Per Hour $44.00 pHiconductivity Meter Per Day 7 $25.00 1 $175.0 <br /> Technical Secretary Per Hour 6 $42.00 $252.00 Turbidity Meter Per Day 7 $55.00 $385,00 <br /> Subtotal: $16,856.00 Dissolved Oxygen Meter Per Day 7 $105.00 $735,00 <br /> Bailer Usage (Stainless Steel or Teflon-Per Each) Per Day $28.00 <br /> DRILLING Concrete Saw Per Day $140.00 <br /> OBILIZATION/DEMOBILOATION Concrete Coring Machine bEach <br /> 2 $125.00 $250,00 <br /> Men and Equipment (lump sum) Per Mob. 1 $250.00 $250.00 EnCore Soil Sampler (5 gram) $25.00 <br /> Lump Sum Men and Equipment Mob, Per Mob. $500.00 Disposable Teflon Bailer $27.00 <br /> Mileage - Rig Per Mile $1 .10 Disposable Poyethylene Bailer $17.00 <br /> Mileage - Truck Per Mile $0.60 High Capacity (1 .0 micron) Filter $29.00 <br /> Mileage - Automobile Per Mile $0.44 16 oz. Sol Jars soil gas analysis) 20 $10.00 $200.UGER BORINGS <br /> Tygon Tubing 20 $2.50 $50. <br /> Hand Auger Borings (Two-Man Crew) Per Hour 70 1 $145.00 $10050v001 Polyethylene Tubing Per Foot 450 $0.60 $270. <br /> Auger Borings (44rch) Per LF $1025 1 Isopropyl Alcohol (decontamination) Per Gel. $19.00 <br /> PT BORINGS (ASTM DA 586) in Soil (N-values <50): Deionized Water (decontamination) Per 5 Gal $14.00 <br /> from surface to 25 feet Per LF $15.00 55-gallon Drum Each 20 $65.00 $1 ,300. <br /> from 25 feet tO 50 feet Per LF $16.75 Visqueen 100 Feet by 20 Feet) Per Roll $120.00 <br /> from 50 feet to 100 feet Per LF $18.75 Well or Piezometer Materials Estimated Per Wel 26 $100.00 $21600. <br /> from 100 feet to 125 feet Per LF $23.75 Miscellaneous Equip. & Expend., Estimated ump Surr 4 $50.00 $200. <br /> from 125 feet tD 150 feet Per LF $31 .50 Subtotal: 7,828. <br /> ADDITIONAL SAMPLES FOR CONTINUOUS SPT SAMPLING: COMPACTION AND CLASSIFICATION TESTS <br /> from 10 feet to 25 feet Per Sample $29.00 Proctor, Standard or Modified Per Test $102.00 <br /> from 25 feet to 50 feet Per Sample $32,00 Moisture Content (ASTM D-2216) Per Test $13.00 <br /> from 50 feet to 100 feet Per Sample $36.00 Sieve Analysis ASTM D=421 , D-422) Per Test $45.50 <br /> from 100 feet to 125 feet Per Sample $41 .00 Percent Fines (ASTM DA 140) Per Test $30.50 <br /> from 125 feet lo 150 feet Per Sample $51 .00 Subtotal: �$0'00 <br /> ASH BORINGS AND UNDISTURBED SOIL SAMPLING <br /> 3w Wash Borings in Sol - Cuttings Only Per LF $7.50 LABORATORY ANALYSIS AND OTHER SUBCONTRACTED SERVICES <br /> Shelby Tube Per Sample $130.00 EPA MV8021 VOA's Only - water Per Test $69.00 <br /> Fbred-Piston Shelby, Osterberg, Pitcher Per Sample $158.00 EPA 602/8021 VOA's Only - sol Per Test 6 $97.75 $586,50 <br /> FURNISH, INSTALL, and REMOVE CASING up to 44nch EPA 8260B VOA's & VOH's - water Per Test 26 $126.50 $3,289,00 <br /> from surface to 50 feet Per LF $9.00 EPA 8260B VOA's & VOH's - sol Per Test 6 $161 .00 $966,00 <br /> from 50 feet to 100 feet Per LF $1125 EPA 601/8021 VOH's Only - water Per Test $8625 <br /> from 100 feet to 150 feet Per LF $14.00 EPA 601/8021 VOH's Only - soil Per Test $10925 <br /> ONITORING WELL INSTALLATION EPA 624/8260 Volatiles - water Per Test $149.50 <br /> Temporary 20PVC Well (Piezometer) Per Foot 260 1 $18.00 $4,680.00 EPA 624/8260 Volatiles - soil Per Test $161 .00 <br /> 24ndr PVC Per Foot $29.00 kEPA <br /> 8100 PAH's - water o soil Per Test $126.50 <br /> 44nch PVC Per Foot $40.00 8270 PAH's - water Per Test 26 $126.50 $3,289. <br /> Double Cased PVC Well (2'/6') Per Foot $50.00 8270 PAH's - soil Per Test 12 $138.00 579656.0 <br /> 8' Circular Well Manhole w/Pad Per Each $275.00 625/8270 Semi-Vofs - water or sol Per Test $287.50 <br /> 12' Circular Well Manhole w/Pad Per Each $300.00 by FL-PRO -water o sol Per Test 38 $115.00 $4,370. <br /> Above Ground Riser w/Pad Per Each $300.00 504 EDB -water or soil Per Test $57.50 <br /> RILLING ON TIME BASIS B, FAC 62-770 water Per Test $402.50 <br /> Dulling - 2 man-crew Per Hour $170.00 B, FAC 62470 sol Per Test $276.00 <br /> Drilling - 3 man-crew Per Hour $205.00 Table C, FAC 62470 water Per Test $667.00 <br /> OTHER RELATED DRILLING CHARGESTable C, FAC 62470 sol Per Test $667.00 <br /> Hole Location & Set-Up Per Hour $169.00 Virgin PwBum (petroleum) Per Test $230.00 <br /> Decontamination of Equipment Per Hour 4 $170.00 $680.00 Non-Won Pre-Bum (petroleum) Per Test $287.50 <br /> Drumming Contaminated Soil (w/o Disp) Per Drum 20 $150.00 $3,000.00 EPA 608/8081 CI pestJPCB's Per Test $10925 <br /> Drum Disposal non hazardous) Per Drum 20 $155.00 $3,100.00 EPA 6010 Metals except Hg (each) Per Test $11 .50 <br /> Standby Time Per Hour $169*001 RCRA Metals by EPA 6010 Per Test $10925 <br /> Bore Hole Grouting and Sealing (plus mateda Per Hour $185.00 TCLP/SPLP Extraction by EPA 1311/1312 Per Test $4025 <br /> Lodging and Subsistence Per Crewman Per Day $108.00 EPA TO44 - air Per Test $172.50 <br /> Al Terrain Vehicle Add'VLF $1 .00 EPA 18 - air Per Test $115.00 <br /> Wel Permits Per Each $100.00 Lab Waste Disposal Fee Lump Surd 4 $12001 $48. <br /> Subtotal: $21 ,860,00 Subtotal: $14204. <br /> 12-3836 PCA Cost Estimate.) lsx Page 1 of 1 Printed 11 /29/2012 at 2:26 PM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.