CLIENT: Indian River County <br /> PROJECT: Intersection of State Road 60 (20th Street) and 43rd Avenue, Vero Beach, Florida <br /> DESCRIPTION: Preliminary Contamination Assessment <br /> TOTAL PROJECT COST: $60,748.50 <br /> NUMBE COST PER NUMBECOST PER <br /> ITEM DESCRIPTION UNITS UNITS UNIT EXTENSION ITEM DESCRIPTION UNITS UNITS UNfT MEXTENSIONPERSONNEL GENER <br />AL FIELD EQUIPMENT AND EXPENDABLES <br /> Principal Engineer Per Hour $165.00 Data Logger Per Day $390.00 <br /> Senior Project Manager Per Hour 4 $135.00 $540.00 Organic Vapor Analyzer (Fti) o PID) Per Day 7 $164.00Project Manager <br /> Per Hour $135.00 Generator Per Day 1 $95.00 <br /> Senior Project Engineer/Geologist Per Hour 80 $115.00 $9,200.00 Pressure Washer Per Day $190.00 <br /> Project Engineer/Geologist III Per Hour $95.00 Surveying Equipment (Water Table Elevs) Per Day $78.00 <br /> Project Engineer/Geologist I Per Hour $95.00 Centrifugal Development Pump Per Day $61 .00 <br /> Assistant Project EngineedGeologist Per Hour $85.00 I Submersible Development Pump Per Day $250.00 <br /> Senior Field Tedvidan IV Per Hour 80 1 $52.00 $4*1604001 Peristaltic Purging Pump Per Day 7 $40.00 $280. <br /> Field Technician III Per Hour 40 $52.00 $2,080.00 Magnetometer Per Day $62.00 <br /> Field Technician II Per Hour $44.00 Water Level Indicator Per Day 7 $20.00 $140. <br /> Senior Technical Draftsmen Per Hour 12 $52.00 $624.00 Product/Water Interface Probe Per Day $82.00 <br /> Technical Draftsmen Per Hour $44.00 pHiconductivity Meter Per Day 7 $25.00 1 $175.0 <br /> Technical Secretary Per Hour 6 $42.00 $252.00 Turbidity Meter Per Day 7 $55.00 $385,00 <br /> Subtotal: $16,856.00 Dissolved Oxygen Meter Per Day 7 $105.00 $735,00 <br /> Bailer Usage (Stainless Steel or Teflon-Per Each) Per Day $28.00 <br /> DRILLING Concrete Saw Per Day $140.00 <br /> OBILIZATION/DEMOBILOATION Concrete Coring Machine bEach <br /> 2 $125.00 $250,00 <br /> Men and Equipment (lump sum) Per Mob. 1 $250.00 $250.00 EnCore Soil Sampler (5 gram) $25.00 <br /> Lump Sum Men and Equipment Mob, Per Mob. $500.00 Disposable Teflon Bailer $27.00 <br /> Mileage - Rig Per Mile $1 .10 Disposable Poyethylene Bailer $17.00 <br /> Mileage - Truck Per Mile $0.60 High Capacity (1 .0 micron) Filter $29.00 <br /> Mileage - Automobile Per Mile $0.44 16 oz. Sol Jars soil gas analysis) 20 $10.00 $200.UGER BORINGS <br /> Tygon Tubing 20 $2.50 $50. <br /> Hand Auger Borings (Two-Man Crew) Per Hour 70 1 $145.00 $10050v001 Polyethylene Tubing Per Foot 450 $0.60 $270. <br /> Auger Borings (44rch) Per LF $1025 1 Isopropyl Alcohol (decontamination) Per Gel. $19.00 <br /> PT BORINGS (ASTM DA 586) in Soil (N-values <50): Deionized Water (decontamination) Per 5 Gal $14.00 <br /> from surface to 25 feet Per LF $15.00 55-gallon Drum Each 20 $65.00 $1 ,300. <br /> from 25 feet tO 50 feet Per LF $16.75 Visqueen 100 Feet by 20 Feet) Per Roll $120.00 <br /> from 50 feet to 100 feet Per LF $18.75 Well or Piezometer Materials Estimated Per Wel 26 $100.00 $21600. <br /> from 100 feet to 125 feet Per LF $23.75 Miscellaneous Equip. & Expend., Estimated ump Surr 4 $50.00 $200. <br /> from 125 feet tD 150 feet Per LF $31 .50 Subtotal: 7,828. <br /> ADDITIONAL SAMPLES FOR CONTINUOUS SPT SAMPLING: COMPACTION AND CLASSIFICATION TESTS <br /> from 10 feet to 25 feet Per Sample $29.00 Proctor, Standard or Modified Per Test $102.00 <br /> from 25 feet to 50 feet Per Sample $32,00 Moisture Content (ASTM D-2216) Per Test $13.00 <br /> from 50 feet to 100 feet Per Sample $36.00 Sieve Analysis ASTM D=421 , D-422) Per Test $45.50 <br /> from 100 feet to 125 feet Per Sample $41 .00 Percent Fines (ASTM DA 140) Per Test $30.50 <br /> from 125 feet lo 150 feet Per Sample $51 .00 Subtotal: �$0'00 <br /> ASH BORINGS AND UNDISTURBED SOIL SAMPLING <br /> 3w Wash Borings in Sol - Cuttings Only Per LF $7.50 LABORATORY ANALYSIS AND OTHER SUBCONTRACTED SERVICES <br /> Shelby Tube Per Sample $130.00 EPA MV8021 VOA's Only - water Per Test $69.00 <br /> Fbred-Piston Shelby, Osterberg, Pitcher Per Sample $158.00 EPA 602/8021 VOA's Only - sol Per Test 6 $97.75 $586,50 <br /> FURNISH, INSTALL, and REMOVE CASING up to 44nch EPA 8260B VOA's & VOH's - water Per Test 26 $126.50 $3,289,00 <br /> from surface to 50 feet Per LF $9.00 EPA 8260B VOA's & VOH's - sol Per Test 6 $161 .00 $966,00 <br /> from 50 feet to 100 feet Per LF $1125 EPA 601/8021 VOH's Only - water Per Test $8625 <br /> from 100 feet to 150 feet Per LF $14.00 EPA 601/8021 VOH's Only - soil Per Test $10925 <br /> ONITORING WELL INSTALLATION EPA 624/8260 Volatiles - water Per Test $149.50 <br /> Temporary 20PVC Well (Piezometer) Per Foot 260 1 $18.00 $4,680.00 EPA 624/8260 Volatiles - soil Per Test $161 .00 <br /> 24ndr PVC Per Foot $29.00 kEPA <br /> 8100 PAH's - water o soil Per Test $126.50 <br /> 44nch PVC Per Foot $40.00 8270 PAH's - water Per Test 26 $126.50 $3,289. <br /> Double Cased PVC Well (2'/6') Per Foot $50.00 8270 PAH's - soil Per Test 12 $138.00 579656.0 <br /> 8' Circular Well Manhole w/Pad Per Each $275.00 625/8270 Semi-Vofs - water or sol Per Test $287.50 <br /> 12' Circular Well Manhole w/Pad Per Each $300.00 by FL-PRO -water o sol Per Test 38 $115.00 $4,370. <br /> Above Ground Riser w/Pad Per Each $300.00 504 EDB -water or soil Per Test $57.50 <br /> RILLING ON TIME BASIS B, FAC 62-770 water Per Test $402.50 <br /> Dulling - 2 man-crew Per Hour $170.00 B, FAC 62470 sol Per Test $276.00 <br /> Drilling - 3 man-crew Per Hour $205.00 Table C, FAC 62470 water Per Test $667.00 <br /> OTHER RELATED DRILLING CHARGESTable C, FAC 62470 sol Per Test $667.00 <br /> Hole Location & Set-Up Per Hour $169.00 Virgin PwBum (petroleum) Per Test $230.00 <br /> Decontamination of Equipment Per Hour 4 $170.00 $680.00 Non-Won Pre-Bum (petroleum) Per Test $287.50 <br /> Drumming Contaminated Soil (w/o Disp) Per Drum 20 $150.00 $3,000.00 EPA 608/8081 CI pestJPCB's Per Test $10925 <br /> Drum Disposal non hazardous) Per Drum 20 $155.00 $3,100.00 EPA 6010 Metals except Hg (each) Per Test $11 .50 <br /> Standby Time Per Hour $169*001 RCRA Metals by EPA 6010 Per Test $10925 <br /> Bore Hole Grouting and Sealing (plus mateda Per Hour $185.00 TCLP/SPLP Extraction by EPA 1311/1312 Per Test $4025 <br /> Lodging and Subsistence Per Crewman Per Day $108.00 EPA TO44 - air Per Test $172.50 <br /> Al Terrain Vehicle Add'VLF $1 .00 EPA 18 - air Per Test $115.00 <br /> Wel Permits Per Each $100.00 Lab Waste Disposal Fee Lump Surd 4 $12001 $48. <br /> Subtotal: $21 ,860,00 Subtotal: $14204. <br /> 12-3836 PCA Cost Estimate.) lsx Page 1 of 1 Printed 11 /29/2012 at 2:26 PM <br /> I <br />