My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-017
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:23:28 AM
Creation date
10/1/2015 3:51:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/07/2012
Control Number
2012-017
Agenda Item Number
12.J.1
Entity Name
Atkins North America, Inc.
Subject
Work Order No. 1 Odor Improvements
Area
West Regional Wastewater Treatment Plant
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10802
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as 1.2 - Specifications <br />CONSULTANT will prepare technical specifications and incorporate into a specification book. Front-end <br />(Division 0 and 1) specifications will be received from the County in an electronic format and <br />CONSULTANT will modify them to make them project specific. <br />Task 1.3 -Construction Cost Estimate <br />CONSULTANT will prepare estimates of probable construction costs at approximately the 60 percent, 90 <br />and 100 percent levels of design completion. <br />Task l.4 -County Reviews <br />CONSULTANT will attend three progress review meetings with County staff at approximately the 60, 90 <br />and 100 percent levels of design completion. A single set of written review comments from the County <br />shall be provided to CONSULTANT before each review meeting. <br />TASK 2 —SURVEY <br />No new survey is anticipated. Atkins will use the previous aerial base drawing for locating the landscape <br />screening buffer. <br />TASK 3 -PERMITTING <br />CONSULTANT will prepare permit applications and associated submittals for the following permits: <br />• FDEP Construction —Minor Modification <br />No wetlands, endangered species or other ecological permitting is anticipated or included herein. <br />CONSULTANT shall respond to up to one (1) request for additional information by each of the permitting <br />agencies. <br />County will be responsible for all permit fees. <br />TASK 4 -BIDDING PHASE SERVICES <br />Task 4.1 -Document Distribution and Pre -Bid Meetin <br />The CONSULTANT will assist COUNTY with Bidding Services. CONSULTANT shall provide <br />COUNTY with the following services during the bidding process: <br />• Attend one (1) Pre -Bid meeting. <br />• Provide technical responses for one addendum to clarify the bidding documents. The <br />COUNTY shall be responsible for distributing addendum responses to bidders. <br />• Evaluate received bids and provide an award recommendation <br />The COUNTY shall be responsible for setting the bid opening date, advertisement of the bid, scheduling <br />the pre-bid meeting, and scheduling the bid opening. The CONSULTANT will prepare and distribute <br />bound hard copies of the bid documents (24"x36" full size drawings and Specification Book) for its use in <br />distributing/selling bid documents to prospective bidders. The CONSULTANT will keep a log of all <br />parties obtaining bid documents. The CONSULTANT will provide the COUNTY with electronic PDF <br />copies of the bid documents. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.