My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-017
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:23:28 AM
Creation date
10/1/2015 3:51:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/07/2012
Control Number
2012-017
Agenda Item Number
12.J.1
Entity Name
Atkins North America, Inc.
Subject
Work Order No. 1 Odor Improvements
Area
West Regional Wastewater Treatment Plant
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10802
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5.6 -Record Drawings <br />CONSULTANT shall prepare one reproducible set and two (2) sets of signed and sealed blueprints of <br />record drawings for the County based solely on information provided by the Contractor. CONSULTANT <br />will furnish an electronic copy of record drawings in AutoCAD format on CD. <br />DELIVERABLES <br />The following deliverables will be provided to OUC <br />TASK 1 - Final Design (60°/0, 90% and bid ready documents) <br />TASK 4 - Permitting (FDEP Minor Modification Permit Applications) <br />TASK 5 - Construction Services (Record drawings) <br />SCHEDULE <br />The services described herein will be provided based on the following number of days frN <br />Proceed unless otherwise noted: om otice to <br />TASK 1- 3 120 days from NTP <br />TASK 4 45 days from advertisement <br />TASK 5 365 days from construction notice to proceed. <br />KEY PERSONNEL <br />CONSULTANT proposes to utilize the following persom�el in providing the services described herein: <br />Design Manager Raj Singh, P.E <br />COMPENSATION <br />Compensation for Work Order No. 1 services described herein will be based on the lump sum Method in <br />accordance with Section 5 of the Agreement. The total estimated fee shall not exceed S109,980.00 without <br />mutual agreement by the County and CONSULTANT. The individual task compensation shall be as <br />follows: <br />Task 1 —Final Dec; <br />Task 2 —Surveying; <br />Task 3 — Permitting: <br />Task 4 — Bid Phase Services: <br />Task 5 — Construction Services: <br />Total Compensation Task 1 thru 5 <br />559,550.00 <br />0 <br />$2,100.00 <br />54,800.00 <br />543,530.00 <br />S 109,980.00 <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.