Laserfiche WebLink
EXHIBIT A <br /> Atkins North America, Inc. <br /> 482 South Keller Road <br /> Orlando, Florida 32810-6101 <br /> Telephone: + 1 .407 .647 . 7275 <br /> www . atkinsalobaI . com / northamerica <br /> November 4 , 201 1 <br /> Mike Hotchkiss <br /> Capital Projects Manager <br /> Indian River County <br /> 1801 27th Street . <br /> Vero Beach , FI 32960 <br /> Dear Mike , <br /> As we discussed on the phone , just after we have finished the building drawings based on the <br /> previous changes requested for the roll -off dumpster , Waste Management ( WM ) provided a <br /> dumpster drawing that illustrates a much larger dumpster than the previously agreed 6 ' x8 ' <br /> dumpster. In your may 3 , 2012 e - mail you asked how much revised building and additional <br /> engineering would cost for the changes . We contacted the WM to coordinate the dumpster size <br /> and they indicated they can live with a 6 ' x8 ' dumpster . We contacted the building manufacturer <br /> also for the additional building cost . Since the building size did not change significantly , the <br /> additional cost was estimated to be about only $ 3000 . 00 ; however the building manufacturer <br /> indicated for this size of a building , a masonry building may also be cost effective . At that time <br /> we indicated to you that we will accommodate the building changes without any additional <br /> compensation . Structural , mechanical and electrical drawings were changed as illustrated in the <br /> submitted set . <br /> On May 29 , WM sent a dumpster drawing through Richard Meckes , which shows a dumpster <br /> size of 99 . 375 " X120 " . We contacted WM again and this time they indicated they can make the <br /> length 96 i . e . 8 ' - 0" , however due to track roller placement , the width cannot be reduced <br />from <br /> 99 . 375 inches . This presents another challenge . The roll - up doors are only 9 ' - 0" wide due to the <br /> on - site space constraints . To accommodate the wider dumpster, the doors need to be wider that <br /> means the building has to be changed once again . The building does not have space to grow <br /> especially towards the plant drain pump station . Only way to accommodate the changes is to <br /> change the building to a masonry building to optimize the corner and middle support column <br /> design to provide a wider roll -up door opening . <br />