My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-124
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:23:45 AM
Creation date
10/1/2015 5:21:54 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT <br />June 18, 2013 <br />Mike Hotchkiss <br />Capital Projects Manager <br />Indian River County <br />1801 27th Street. <br />Vero Beach, F132960 <br />Aticins North Amenca, Inc. <br />482 South Keller Road <br />Orlando, Florida 3281 M1 01 <br />Telephone: +1.407.647.7275 <br />.lel ll L l <br />RE: West Regional WWTP <br />Anaerobic Tanks Odor Control System <br />Amendment for Clarifiers No. land 2 Rehab and Walkway Replacement <br />Dear Mike, <br />Based on our field visit and clarifiers inspection requested by you, it was determined the existing <br />clarifiers #1 and #2 are in dire need of mechanisms and walkway rehabilitation. During the site <br />visit, the corrosion expert and our structural engineer determined while the walkways over the <br />clarifiers and the mechanisms can be salvaged; by painting and cleaning, the walkway between <br />the clarifiers is beyond repair and need replacement. Following is a summary of the <br />repair/replacement scope: <br />• Rehabilitate the clarifier mechanisms for clarifiers # 1 and #2. <br />• Rehabilitate the clarifier walkways for clarifiers # 1 and #2. <br />• Replace the sludge squeegees on the clarifier <br />mechanisms <br />Jr this task after the mechanism rehab. <br />• Replace walkway between clarifiers #I and #2. <br />• Paint clarifiers #1 and #2 exterior <br />• Paint existing chlorine building and fascia board. <br />(County maintenance_ can <br />Engineering services related to this scope were not anticipated or included in the original scope. <br />Scope of these additional services will include the following: <br />• Conduct site visit <br />• Prepare a condition assessment and rehab recommendation report <br />• Review Report with County and prepare drawings/sketches for Walkway between <br />clarifiers #1 and #2. <br />• Prepare and issue change order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.