Laserfiche WebLink
FF <br /> 0 DAYS Sq.Footage <br /> C.O P. #1 - Use Millings in lieu of coquina base 0 WEEKS <br /> 0 Months <br /> afq DESCRIPTION mroNTRACrOR TOTAL. LMES - - LABOR - MTL SUB TOTAL .COSTISF <br /> Cost Code - ♦ - _ - IF0.00 <br /> IF IF 0.00 <br /> IF 0.00 <br /> 02000 Tim Rose Contractin <br /> 4545 Sq yds - 3.301 ` ' 43,301 43,301 0.00 <br /> 10" Millings , (45,450) (45,450) 0.00 <br /> credit 8" Coquina 4545 sq yds 4Z27 <br /> 0.00 <br /> IF <br /> 960 sq yds " r - - 61827 89827 0.00 <br /> 8" Millim s , (7,200) (71200) 000 <br /> credit 6" coquina 960 sq yds (70 ) <br /> _ 0.00 <br /> IF <br /> IF IF <br /> Additional testin KS M 250 • 250 250 0.00 <br /> EO1IF IF 0.00 <br /> y 0.00 <br /> i 0.00 <br /> IF 0.00 <br /> IF IF <br /> IF 0.00 <br /> IF <br /> rIF 0.00 <br /> 0.00 <br /> « IF 0.00 <br /> « 0.00 <br /> « 0.00 <br /> r <br /> « IF 0.00 <br /> _ « _ 0.00 <br /> FFFFFI 0.00 <br /> IF 0.00 <br /> IF 0.00 <br /> + <br /> IF 0.00 <br /> : _ . . . _ . . . . _ IFIF0.00 <br /> IFFFIFIFFFI IF 0.00 <br /> IF <br /> SUB TOTALS (173) • (273) (273 0.00 <br /> LABOR BURDEN <br /> Sub-Total213 <br /> Overhead I <br /> 01020 <br /> PreCon Fee <br /> Sub Total " 273) �� <br /> Sub-Total (273) <br /> P&P Bond @ . 7% <br /> Total Bid <br />