.5 additional costs of supervision and field office personnel directly attributable <br /> to the change ; and fees paid to the Architect, engineers and other <br /> professionals . <br /> § 8 .3 .3 Pending final determination of cost to the Owner, amounts not in dispute may be <br /> included in Applications for Payment. The amount of credit to be allowed by the <br /> Design/Builder to the Owner for deletion or change which results in a net decrease in <br /> the Contract Sum will be actual net cost. When both additions and credits covering <br /> related Work or substitutions are involved in a change , the allowance for overhead and <br /> profit shall be figured on the basis of the net increase , if any , with respect to that <br /> change . <br /> § 8 . 3 .4 When the Owner and the Design/Builder agree upon the adjustments in the <br /> Contract Sum and Contract Time , such agreement shall be effective immediately and <br /> shall be recorded by preparation and execution of an appropriate Change Order. <br /> § 8 .4 MINOR CHANGES IN THE WORK <br /> § 8 .4. 1 The Design/Builder shall have authority to make minor changes in the <br /> Construction Documents and construction consistent with the intent of the Contract <br /> Documents when such minor changes do not involve adjustment in the Contract Sum or <br /> extension of the Contract Time , The Design/Builder shall promptly inform the Owner, in <br /> writing , of minor changes in the Construction Documents and construction . <br /> § 8.5 CONCEALED CONDITIONS <br /> § 8 .5 . 1 If conditions are encountered at the site which are ( 1 ) subsurface or otherwise <br /> concealed physical conditions which differ materially from those indicated in the <br /> Contract Documents , or (2 ) unknown physical conditions of an unusual nature which <br /> differ materially from those ordinarily found to exist and generally recognized as <br /> inherent in construction activities of the character provided for in the Contract <br /> Documents , then notice by the observing party shall be given to the other party promptly <br /> before conditions are disturbed and in no event later than 21 days after first observance <br /> of the conditions . The Contract Sum shall be equitably adjusted for such concealed or <br /> unknown conditions by Change Order upon claim by either party made within 21 days <br /> after the claimant becomes aware of the conditions . <br /> § 8 .6 REGULATORY CHANGES <br /> § 8 .6 . 1 The Design/Builder shall be compensated for changes in the construction <br /> necessitated by the enactment or revisions of codes , laws or regulations subsequent to <br /> the submission of the Design/Builder's Proposal . <br /> ARTICLE 9 CORRECTION OF WORK <br /> § 9 . 1 The Design/Builder shall promptly correct Work rejected by the Owner or known <br /> by the Design/Builder to be defective or failing to conform to the requirements of the <br /> Contract Documents , whether observed before or after Substantial Completion and <br /> whether or not fabricated , installed or completed . The Design/Builder shall bear costs <br /> of correcting such rejected Work , including additional testing and inspections . <br /> § 9 .2 If, within one ( 1 ) year after the date of Substantial Completion of the Work or, after <br /> the date for commencement of warranties established in a written agreement between <br /> the Owner and the Design/Builder, or by terms of an applicable special warranty <br /> required by the Contract Documents , any of the Work is found to be not in accordance <br /> 15 <br />