My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-026
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 1:23:53 PM
Creation date
10/1/2015 5:07:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/05/2013
Control Number
2013-026
Agenda Item Number
15.A.2
Entity Name
Barth Construction
Subject
Fire Station No.13 Phase III Expansion
Area
Fire Station No.13
Supplemental fields
SmeadsoftID
11725
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment " A " <br /> BARTH <br /> Construction, Inc. <br /> General Contractor CGC007847 <br /> December 06, 2012 <br /> John King <br /> Indian River County Emergency Services <br /> 4225 43 rd Avenue <br /> Vero Beach, Florida, 32960 <br /> Re: Station # 13 Phase III <br /> Mr. King, <br /> We are pleased to present to you our proposal for Phase III services for Fire Station # 13 site. A summary <br /> of the project costs follows, <br /> Restroom in Garage Building $ 133,945.00 <br /> Covered Lean-to area on North Side $ 11 ,685 .00 <br /> Floor drain and oil interceptor $ 4,785 .00 <br /> New water service to site $ 15 , 179.00 <br /> Vehicle exhaust system $ 15 ,751 .00 <br /> Total Part III Design & Construction Costs $619345.00 <br /> The costs above are further explained below, <br /> Required Restroom $ 13 ,945 .00 <br /> We could not anticipate a change in the building code, adopted in May 2012, <br /> requiring separate men ' s and women' s facilities in the new maintenance building. <br /> IRC Building did allow using the restroom in the existing building as one of the <br /> required facilities reducing this additional expense by approximately 50%. <br /> Lean-To on North side of Metal Building $ 12,685 .00 <br /> An 8 ' wide x 55 ' long covered area (called a lean-to) was added to the north side <br /> of the new metal building to protect the bulk oil storage tank and air compressor. <br /> This includes metal wall panels to shields neighbors from the compressor noise. <br /> Floor Drains & Interceptor $42785 .00 <br /> j The floor drains in the new maintenance building will be required. The pipes for <br /> these drains are required to be ductile iron and drain into an oil/pollutant interceptor. <br /> The exiting building will not be required to have the drains and pipe installed. <br /> I <br /> New Water Service to Site $ 159179.00 <br /> The existing water service to the existing metal building connects to the water main <br /> in the west ROW of 43rd avenue . It runs westward through the property and also previously <br /> serviced the (2) residences that were demolished. The location of this service is in the <br /> footprint of the proposed retention lake and future Fire Station. This service will <br /> need to be abandoned and the new, permitted service installed. The includes the new tap, <br /> short water main extension, Fire Hydrant and 2" water service for the existing and <br /> proposed new metal buildings. <br /> 1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960 <br /> Phone : (772) 778-3072 * Fax: (772) 770-3017 <br /> E-mail: info@barthconstruction.com * Internet: www.barthconstruction .com <br /> G :\Projects\IRC Fire Stations 201 MRC Fire Station # 13\Phase 3 cover letter 12.06 . 12 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.