My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-026
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 1:23:53 PM
Creation date
10/1/2015 5:07:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/05/2013
Control Number
2013-026
Agenda Item Number
15.A.2
Entity Name
Barth Construction
Subject
Fire Station No.13 Phase III Expansion
Area
Fire Station No.13
Supplemental fields
SmeadsoftID
11725
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 1 .2 EXECUTION , CORRELATION AND INTENT <br /> § 1 .2. 1 It is the intent of the Owner and Design/Builder that the Contract Documents <br /> include all items necessary for proper execution and completion of the Work . The <br /> Contract Documents are complementary, and what is required by one shall be as <br /> binding as if required by all ; performance by the Design/Builder shall be required only to <br /> the extent consistent with and reasonably inferable from the Contract Documents as <br /> being necessary to produce the intended results . Words that have well-known technical <br /> or construction industry meanings are used in the Contract Documents in accordance <br /> with such recognized meanings . <br /> § 1 .2 . 2 If the Design/Builder believes or is advised by the Architect or by another design <br /> professional retained to provide services on the Project that implementation of any <br /> instruction received from the Owner would cause a violation of any applicable law, the <br /> Design/Builder shall notify the Owner in writing . Neither the Design/Builder nor the <br /> Architect shall be obligated to perform any act which either believes will violate any <br /> applicable law. <br /> § 1 . 2 . 3 Nothing contained in this raft-2 Agreement shall create a contractual <br /> relationship between the Owner and any person or entity other than the Design/Builder. <br /> § 1 .3 OWNERSHIP AND USE OF DOCUMENTS <br /> § 1 . 3 . 1 The Owner hopes to use the plans, Drawings , specifications , and othef <br /> documents and electronic data furnished by the Design/Builder <br /> . The <br /> Design/Builder's Architect and other providers of professional services shall retain all <br /> common law, statutory and other reserved rights , including copyright in those <br /> instruments of service furnished by them , except the owner shall have the right to reuse <br /> the instruments for construction of additional storage building . , <br /> and ethei: dOGUFnents and eleGtreRiG data aFe fUFRished fGF use solely with FespeGt te this <br /> PaFt 2 Agreement_ The Owner shall be permitted to retain copies , including reproducible <br /> copies , of the drawings , specifications , and other documents and electronic data <br /> furnished by the Design/Builder for information and reference in connection with the <br /> Project except as provided in Sections 1 . 3 . 2 and 1 . 3 . 3 . The Owner intends that the <br /> documents , drawings , plans , specifications and electronic data are intended to be <br /> reused at some future time . Pursuant to FS 287 . 055( 10 ) , the documents and plans <br /> shall contain notice to the public that the plans are subiect to reuse . <br /> § 1 .3 .2 Drawings , specifications , and other documents and electronic data furnished by <br /> the Design/Builder shall not be used by the Owner or others on other projects , for <br /> additions to this Project or for completion of this Project by others , except by agreement <br /> in writing and with appropriate compensation to the Design/Builder, unless the <br /> Design/Builder is adjudged to be in default under this Daft-2 Agreement or under any <br /> other subsequently executed agreement . <br /> § 1 .3 .3 If the Design/Builder defaults in the Design/Builder's obligations to the Owner, <br /> the Architect shall grant a license to the Owner to use the drawings , specifications , and <br /> other documents and electronic data furnished by the Architect to the Design/Builder for <br /> the completion of the Project , conditioned upon the Owner's execution of an agreement <br /> to cure the Design/Builder's default in payment to the Architect for services previously <br /> performed and to the extent allowed by law, indemnify the Architect with regard to <br /> claims arising from such reuse without the Architect's professional involvement. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.