Laserfiche WebLink
The determination of the appropriate method(s) of compliance is the complete and sole <br /> responsibility of the BIDDER . Such methods will not be checked by the OWNER or <br /> ENGINEER for accuracy, completeness or any other purpose. The OWNER and <br /> ENGINEER shall have no responsibility to review or check the BIDDER's compliance <br /> with the Trench Safety Standards , <br /> 8 . The BIDDER , in submitting this bid , represents that it has obtained and considered all <br /> available geotechnical information , has utilized said geotechnical information and that, <br /> based on such ' information and the BIDDER's own information , the BIDDER has <br /> sufficient knowledge of the Project's surface and subsurface site conditions and <br /> characteristics to assure BIDDER's compliance with the applicable Trench Safety <br /> Standards in designing the trench safety system (s) for the Project. <br /> BIDDER: Barth Construction , Inc . <br /> By: Phil Barth Pres '. <br /> Position or Title : President <br /> Dater November 21 , 2012 <br /> STATE OF Florida <br /> COUNTY OF Indian River <br /> Personally appeared before me, the undersigned authority, Phil Barth <br /> who after first being sworn by me , affixed his/her signature in the space provided above on this <br /> 21st day of November , 20 12 <br /> Notary Public, State at large <br /> My Commission Expires : 7 /Z ,//, <br /> np, MAFAON R IUPW <br /> MYtXIllBl20N # EE 189889 <br /> EVIHE& July 21, 2018 <br /> eolteedTlwttyPu�aus * * END OF SECTION <br /> 00454 - Florida Trench Safety Act - REV 04-07,doc <br /> 00454 - 2 <br /> F:1Public WorkslENGINEERiNG DIVISION PROJECTS11126 - RFP South Co Park Multi Purpose Flelds%fthri bld documente\Conirec! DoeumentsA004M - Florida Trench <br /> n-t- .. AH eCI nA n9 Anw <br />