My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 1:52:14 PM
Creation date
10/1/2015 5:00:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227B
Agenda Item Number
8.V.
Entity Name
Barth Construction Inc.
Subject
South County Regional Park Multi-Purpose Fields
Contract and Specifications
Area
South County Regional Park
Project Number
1126
Bid Number
2013009
Supplemental fields
SmeadsoftID
11695
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Drawings—That part of the Contract completion date or time prior to Substantial Comple- <br /> Documents prepared or approved by ENGINEER tion of all the Work. <br /> which graphically shows the scope, extent, and <br /> character of the Work to be performed by 28 . Notice of Award—The written notice by <br /> CONTRACTOR. Shop Drawings and other OWNER to the apparent successful bidder stating that <br /> CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful <br /> defined . bidder with the conditions precedent listed therein , <br /> OWNER will sign and deliver the Agreement. <br /> 18. Effective Date of the Agreement—The <br /> date indicated in the Agreement on which it becomes 29. Notice to Proceed—A written notice given <br /> effective, but if no such date is indicated , it means the by OWNER to CONTRACTOR fixing the date on <br /> date on which the Agreement is signed and delivered which the Contract Times will commence to run and <br /> by the last of the two parties to sign and deliver. on which CONTRACTOR shall start to perform the <br /> Work under the Contract Documents. <br /> 19. ENGINEER—The individual or entity <br /> named as such in the Agreement. 30. OWNER—The individual, entity, public <br /> body, or authority with whom CONTRACTOR has <br /> 20. ENGINEER's Consultant—An individual or entered into the Agreement and for whom the Work is <br /> entity having a contract with ENGINEER to furnish to be performed , <br /> services as ENGINEER's independent professional <br /> associate or consultant with respect to the Project and 31 . Partial Utilization—Use by OWNER of a <br /> who is identified as such in the Supplementary substantially completed part of the Work for the pur. <br /> Conditions. pose for which it is intended (or a related purpose) <br /> prior to Substantial Completion of all the Work. <br /> 21 . Field Order—A written order issued by <br /> ENGINEER. which requires minor changes in the 32. PCBs—Polychlorinated biphenyls. <br /> Work but 7which does not involve a change in the <br /> Contract Price or the Contract Times. 33. Petroleum—Petroleum , including crude oil <br /> or any fraction thereof which is liquid at standard <br /> 22 . General Requirements—Sections of conditions of temperature and pressure (60 degrees <br /> Division 1 of the Specifications. The General Fahrenheit and 14. 7 pounds per square inch <br /> Requirements pertain to all sections of the Specifica- absolute), such as oil, petroleum , fuel oil, oil sludge, oil <br /> tions. refuse, gasoline, kerosene, and oil mixed with other <br /> non-Hazardous Waste and crude oils. <br /> 23. Hazardous Environmental Condition—The <br /> presence at the Site of Asbestos, PCBs, Petroleum , 34. Project The total construction of which <br /> Hazardous Waste, or Radioactive Material in such the Work to be performed under the Contract <br /> quantities or circumstances that may present a Documents may be the whole, or a part as may be <br /> substantial danger to persons or property exposed indicated elsewhere in the Contract Documents, <br /> thereto in connection with the Work. <br /> 35. Project Manual—The bound documentary <br /> 24. Hazardous Waste—The term Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section Work. A listing of the contents of the Project Manual, <br /> 1004 of the Solid Waste Disposal Act (42 USC which may be bound in one or more volumes, is <br /> Section 6903) as amended from time to time. contained in the table(s) of contents. <br /> 25. Laws and Regulations; Laws or Regulat- 36. Radioactive Material—Source, special <br /> ions—Any and all applicable laws, rules, regulations, nuclear, or byproduct material as defined by the <br /> ordinances, codes, and orders of any and all govem- Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> mental bodies, agencies, authorities, and courts seq . ) as amended from time to time. <br /> having jurisdiction . <br /> 37 . Resident Project Representative—The <br /> 26. Liens—Charges, security interests, or authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds, real property, or assigned to the Site or any part thereof. <br /> personal property. <br /> 38 . Samples—Physical examples of <br /> 27. Milestone—A principal event specified in materials, equipment, or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion of the Work and which <br /> 00700 - General Conditions REV 0447.doc <br /> 00700 - 6 <br /> FAPublic Works%ENGINEERING DIVISION PROJECTS\1126 - RFP South Co Park Will Purpose FieldslAdmimXbid doamients\Contract Documents100700 - General Conditions <br /> REV 04 <br /> 07.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.