Laserfiche WebLink
CLARIFICATIONS / CORRECTIONSMESTIONS AND RESPONSES <br /> QUESTION NO. 1 <br /> Please provide a general location of the 5 QC locations for the purpose of sizing location the irrigation <br /> main . <br /> ANSWER NO. 2 <br /> Locations of the 5 QC' s shall be coordinated with David Fleetwood, Parks Superintendent, during <br /> construction . <br /> QUESTION NO. 2 <br /> The 5 QC will require the system to be a pressurized system . IS a variable speed pump or a cycle stop <br /> valve preferred ? <br /> ANSWER NO . 2 <br /> According to David Fleetwood , the system will need to be pressurized . The system is required to have <br /> variable frequency drive with pressure tank . <br /> QUESTION NO. 3 <br /> Are the new trees proposed to be installed in the existing parking lot islands and the new <br /> trees <br /> proposed north of the main park drive to be irrigated ? If yes, how is the irrigation to be installed ? <br /> Open road cut or directional bore ? <br /> ANSWER NO . 3 <br /> No . Permanent irrigation for parking lot islands is not required . Temporary irrigation will be required <br /> in order to establish the sod and trees . <br /> QUESTION NO. 4 <br /> Please confirm a fiberglass enclosure is to be installed fpr the time clock and pump start equipment . <br /> ANSWER NO. 4 <br /> A fiberglass enclosure is required to be furnished and installed for the time clock and pump <br /> equipment . Cost should be included in bid item for 4 ( Four) Multi- Purpose Fields ( Item No . 47 ) . <br /> Page 2 of 11 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\bid docwnents\Addendum No. 3 11 - 1342 .doc <br />