Laserfiche WebLink
to match adjacent sod . <br /> J . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , <br /> as determined by the Engineer, for optimum results . After being placed , the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . <br /> Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days (or until final acceptance , whichever is latest) . <br /> K . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project. Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the establishment <br /> of the grass stand does not appear to be developing satisfactorily. <br /> Replanting or repair necessary due to the Contractor's negligence , carelessness or <br /> failure to provide routine maintenance shall be at the Contractor's expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer. Grass height shall not exceed 6" without mowing (2 " on <br /> fields) . Clippings shall be removed . <br /> L . Article 570-9 . The first two paragraphs under this Article are deleted and the <br /> following substituted : <br /> The contract unit price for sodding shall include the costs of sod , fertilizer (2 <br /> applications) , mowing , sweeping as needed after mowing , pegging disposal of <br /> clippings , water, tools , equipment, labor and all other incidentals necessary . <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No . 30 — Performance Turf ( Sod ) (Argentine Bahia) — Per Square Yard <br /> Bid Item No . 31 — Performance Turf ( Big Roll Sod ) (419 Hybrid Bermuda) ( For <br /> Multi- Purpose Fields),— Per Square Yard <br /> SECTION — 27 — LANDSCAPING <br /> The work specified in this item shall conform to Section 580 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010) . <br /> Payment shall be made under: <br /> Bid Item No . 32 — Slash Pine ( 1 " CAL . , 6-6 ' High) - Per Each <br /> Bid Item No . 33 — Southern Live Oak (3" CAL . , 12 '- 14' High ) — Per Each <br /> Bid Item No . 34 — Sabal Palmetto ( 16C . T . , Heavy Booted , 6 Frond Min . ) Per Each <br /> Bid Item No . 35 — Saw Palmetto (3 GAL . , 14"x14") Per Each <br /> SECTION — 37 - SIGNING AND PAVEMENT MARKINGS <br /> A. Signing and pavement marking for traffic control shall conform to the <br /> requirements of the Standard Specifications (2010) , Manual on Uniform Traffic Control <br /> Devices , Supplemental Specifications , Roadway and Traffic Design Standards , <br /> manufacturer' s specifications . <br /> Addendum #3 11 /13/2012 01025-26 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1126 - South Co Park Multi Purpose Fields\Admim\bid documents\Contract <br /> Documents\Technical Specifications ADD #3.doc <br />