and stored in the County's Storage Yard if they are deemed salvageable by the <br /> Engineer. The excavated materials shall be removed from the job site and disposed in <br /> a location designated or approved by the Owner. Any culverts , structures or any <br /> material excavated or removed from the project site under clearing and grubbing <br /> deemed unsalvageable by the Engineer shall be disposed of in a legal manner by the <br /> Contractor. Where required , suitable material as approved by the Engineer shall then <br /> be backfilled and compacted to restore the original contour of the ground. The fill <br /> material shall be backfilled and compacted in accordance with Section 6 of these <br /> specifications . <br /> H . No additional payment will be made , nor will additional work, or change orders be <br /> authorized for work needed to remove , relocate , protect, or otherwise account for in <br /> the construction of the work depicted in the plans , for any feature , or item that would <br /> be apparent from a careful inspection of the site and review of the plans , even though <br /> such feature or item is not specifically called out in the plans . It is therefore essential <br /> the contractor make such inspection and review. <br /> I . The unit price bid for this item shall include the cost of all labor, tools , and equipment <br /> necessary to excavate , remove , and dispose of those items as directed by the <br /> Engineer and where designated on the Drawings . The cost of restoration and backfill <br /> and compaction for the specific area of removal shall also be included under this item . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item 5 - Clearing and Grubbing - Lump Sum <br /> SECTION — 6 - EXCAVATION , EMBANKMENT AND GRADING <br /> A . Earthwork shall be paid for as embankment . Cost shall include all work specified in <br /> this section and Section 120 of the Florida Department of Transportation Standard <br /> Specifications for Road and Bridge Construction (2010) . <br /> Be Earthwork quantities shall be considered as in -place material with no shrinkage or <br /> expansion factors . <br /> co Subsoil Excavation on Any excavation below the proposed bottom elevation of the select <br /> fill , isolated swale bottom locations , isolated locations for pipe installations and as <br /> approved by the engineer shall be paid for as subsoil excavation . Contractor shall <br /> coordinate with county representative prior to any subsoil excavation . <br /> D . Embankment on General Requirements for Embankment Materials : The following is <br /> added after the first paragraph of Subarticle 1204 . 2 : <br /> Roadway Design Standard Index No . 505 , Embankment Utilization Details is modified <br /> by the addition of the following : <br /> Any stratum or stockpile or soil which contains obvious pockets of highly organic <br /> material may be designated as muck or unsuitable for construction of subgrade by the <br /> Owner. <br /> Backfill ' material containing more than 2 . 0 % by weight of organic material , as <br /> determined by FM 1 -T 267 and by averaging the test results for three randomly <br /> Addendum #2 11 /8/2012 01025-21 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1126 - South Co Park Multi Purpose Fields\Admim\bid documents\Contract <br /> Documents\Technical Specifications ADD #2.doc <br />