My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . Perform Work in accordance with ANSI/AWWA C651 . <br /> 1906 REGULATORY REQUIREMENTS <br /> A. Conform to applicable Florida DEP requirements for performing the work of <br /> this Section . <br /> Be Work shall conform to Indian River County Standards . <br /> PART 2 - PRODUCTS <br /> 2001 DISINFECTION CHEMICALS <br /> A . Chemicals : The disinfecting agent shall be sodium hypochlorite solution <br /> ANSI/AWWA B303 or liquid chlorine ANSI/AWWA B301 . Dry hypochlorite , <br /> similar to " HTH " or equal may also be used as the disinfecting agent. <br /> PART 3 - EXECUTION <br /> 3 . 01 EXAMINATION <br /> A . Verify that piping systems have been cleaned , inspected , and tested . <br /> Be Coordinate scheduling of flushing , pressure testing , and disinfection activities <br /> with tie- ins , certifications , and sequence of construction . <br /> 3 . 02 FLUSHING AND PRESSURE TESTING - PIPING <br /> A . The Contractor shall furnish and install suitable temporary testing plugs or caps <br /> for the water lines , all necessary pressure pumps , hose , pipe connections , <br /> meters , gauges and other similar equipment , and all labor required , all <br /> without additional compensation for conducting pressure and leakage tests <br /> and flushing of the piping . Flushing and pressure testing shall be conducted <br /> in the following order. <br /> Be After all piping lines have been installed and before pressure testing , each run <br /> of pipe shall be thoroughly flushed so as to remove all debris and foreign <br /> Pp 9 Y 9 <br /> matter from the piping and equipment . Clean and flush all piping using <br /> potable water. Sufficient flushing water and pigging shall be introduced into <br /> the piping to produce a discharge that is clear with no evidence of silt or <br /> foreign matter is visible . Contractor to provide means of discharging and <br /> disposing of water at Contractor's expense . <br /> C . Pressure testing ductile iron piping systems : <br /> 1 . The test pressure for the water piping , irrigation quality water piping , <br /> and force main piping systems constructed of ductile iron shall be 150 <br /> psi and this pressure shall be maintained for a period of not less than <br /> two hours . Tests shall be made between valves and as far as <br /> practicable and as approved by the Engineer. Potable water from the <br /> distribution system shall be used . Pressure shall not vary more than <br /> five (5) psi for piping during the test periods or as approved by the <br /> Engineer. Allowable leakage shall be computed on the basis of <br /> AWWA C-600 . <br /> 2 . All leaks evident at the surface shall be uncovered and repaired <br /> regardless of the total leakage as indicated by the test , and all pipes , <br /> valves and fittings and other materials found defective under the test <br /> shall be removed and replaced at the Contractor's expense . Tests <br /> shall be repeated until leakage has been reduced below the allowable <br /> amount . <br /> 3 . In the judgment of the Engineer, should it not be practical to. follow the <br /> Addendum #211 /8/2012 01025-35 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1126 - South Cc Park Multi Purpose Fields\Admim\bid documents\Contract <br /> Documents\Technical Specifications ADD #2.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.