My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-038B
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-038B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:07:12 AM
Creation date
10/1/2015 6:05:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/08/2014
Control Number
2014-038B
Agenda Item Number
8.F.
Entity Name
Bayshore Construction Inc.
Knight McGuire & Associates
Subject
Indian River Lagoon Greenway Phase 2B
Boardwalk and Observation Deck
Area
850 Indian River Boulevard
Bid Number
2014029
Supplemental fields
SmeadsoftID
13129
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations tests, studies and data <br />concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the <br />Site which may affect cost, progress, or performance of the Work or which relate to any aspect of <br />the means, methods techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques sequences, and <br />procedures of construction, if any expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract <br />Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at <br />the Site that relates to the Work as indicated in the Contract Documents. <br />G . CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br />with the Contract Documents. <br />H . CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 1 to 7, inclusive); <br />2. Notice to Proceed <br />3. Public Construction Bond (pages to , inclusive); <br />4. Certificate of Liability Insurance <br />5. Invitation To Bid, Including Appendices A through C <br />6. Drawings consisting of a cover sheet and sheets numbered 1 of 3 through 3 of 3, with each <br />sheet bearing the following general title: Indian River County Lagoon Greenway; <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.