My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-083
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 1:37:06 PM
Creation date
10/1/2015 5:16:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/07/2013
Control Number
2013-083
Agenda Item Number
8.G
Entity Name
Coastal Planning & Engineering Inc.
Subject
Beach and Dune Restoration
Work Order Number 1
Phase 1, Phase 2, and Phase 2B
Area
Sector 3
Supplemental fields
SmeadsoftID
11887
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project was constructed in three phases and the analysis will account for the phased construction. Furthermore, <br /> the report will compare the project performance to the stated design. <br /> Plots of the survey profiles, and graphical representations of volumetric and shoreline positions for the monitoring <br /> area will be presented. Summary tables of the shoreline and volumetric changes will be presented, again looking at <br /> individual and cumulative shoreline and volumetric changes. During our review of previous reports , we noted that <br /> volumetric changes were calculated above MHWL; MHWL to - 12 feet NAVD ; above 42 feet, NAVD ; 42 feet to - <br /> 25 feet, NAVD; and above -25 feet, NAVD. CPE will review the data and historic basis for calculating volumetric <br /> changes to this depth given the presence of nearshore hardbottom. If appropriate, CPE may propose alternate depths <br /> to which to calculate volumetric changes. <br /> CPE will collect aerials of the project area as discussed more fully later in this scope of work. The aerials <br /> will be <br /> collected from R45 through R-60. Plots of hardbottom change and shoreline position will be overlaid on the aerials <br /> and included in the report appendix. <br /> The FDEP approved physical monitoring plan requires that sand samples be collected during summer months <br /> coincident with 24-month post-construction monitoring event at four beach profile transects (R-22, R-30, R41 and <br /> 11- 52) . However, sand was only placed between R-20 and R-36 in Phases 2 and 2B. Therefore, only R-22 and R-30 <br /> will be sampled and analyzed. Five samples will be collected and analyzed along each transect (toe of dune, mid-berm, <br /> MHW, MLW, and -3 feet, NAVD) for a total of 10 samples analyzed. We understand that Morgan & Eklund will <br /> collect these samples and ship them to us for analysis . CPE has a certified laboratory required by FDEP standards to <br /> analyze beach samples . We will follow the FDEP protocols for sieving the samples using 20 sieves ranging in size <br /> from 4. 25 phi to + 4 phi at '/z phi intervals. A cumulative frequency distribution and frequency distribution histogram <br /> will be presented along with a sediment analysis summary sheet providing descriptive statistics, compositional results, <br /> percent fines and Munsell Color. The grain sizes will be compared to previous sediment samples to gauge <br /> any <br /> changes in grain size or color. <br /> Deliverables <br /> CPE will submit a draft of the report of the County for review and comment. This will be submitted electronically <br /> (PDF) . CPE will incorporate comments from the County and revise the report accordingly. CPE will then submit <br /> two hard copies and an electronic copy to the FDEP. CPE will submit one hard copy and one electronic copy (PDF) <br /> to the County. <br /> Required Data <br /> To perform the physical monitoring evaluation, CPE will need the following data: <br /> • Survey data in x,y,z format collected in January 2010, September 2010, July 2011 , May 2012, and July <br /> 2012. <br /> • Design cross-section in electronic format. <br /> • Shape file or Auto CAD file of the landward edge of hardbottom for previous monitoring events. <br /> Schedule <br /> The draft monitoring report will be completed within 60 days of receipt of the survey data from Morgan & Eklund. <br /> We estimate that the county will review and provide comments on the document within 2 weeks. CPE will revise the <br /> 2481 NW BOCA RATON BOULEVARD , BOCA RATON , FL 33431 <br /> 561 . 391 . 8102 • FAX 561 . 391 . 9116 • COASTAL PLANNING & ENGINEERING , INC . , A CB & I COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.