Laserfiche WebLink
Necessary ground control will be extracted from existing imagery sources and used in combination with collected <br /> ABGPS to rectify this imagery. It is assumed that previous control points can be used and have been previously <br /> surveyed. No additional field work is included in this proposal. <br /> Deliverables <br /> CPE will provide the following deliverables : <br /> 1 . Two sets of color 9"x9" photography from R- 15 to R-60 (one for the County and one for FDEP) . <br /> 2. Camera Calibration report for camera used for this task contained on the CD -ROM. <br /> 3. Individual orthorectified frames of each project and reference in an uncompressed Geotiff format stored <br /> on CD-ROM or DVD . <br /> 4. JPEG of mosaicked images. <br /> Required Data <br /> CPE may require additional survey points to rectify the images . We are proposing to sub -contract <br /> Aerial <br /> Cartographics of America (ACA) , who previously performed the work, and they should have sufficient historic survey <br /> points to rectify the images. However, additional survey points may be required. Typically, the Public Works <br /> Department will have surveys that can be used to rectify aerial images avoiding additional field work. <br /> Schedule <br /> We will attempt to time collection of the aerials to coincide with collection of the survey data. Final deliverables <br /> related to the aerials will be submitted within 30 days of collection of the aerials . <br /> Cos <br /> The cost to collect the aerials and rectify the images is $ 15 ,763 . 10. A breakdown of the hours and <br />expenses to <br /> develop these costs is attached and follow the terms of CPE's agreement with Indian River County. <br /> Third Party Review of UMAM <br /> We understand that Continental Shelf Associates (CSA) will be performing a Uniform Mitigation Assessment Method <br /> (LJMAM) evaluation for the Sector 3 Beach and Dune Restoration Project. The UMAM rule (Chapter 62-345, F.A.C .) <br /> went into effect on February 2, 2004 and is used by the FDEP to determine the amount of mitigation needed to offset <br /> adverse impacts to wetlands and other surface waters and to determine mitigation bank credits awarded and debited. <br /> A CPE biologist will evaluate the UMAM analysis to ensure it was prepared in accordance with FDEP guidelines and <br /> instructions contained in rule 62-345, F.A. C. CPE will prepare a summary of their findings from this review to be <br /> submitted to the County. CPE will participate in a conference call with the County and CSA to discuss any issues <br /> identified during our review. <br /> Required Data <br /> Electronic data (preferably GIS database) may be required to quantify changes in hardbottom area. <br /> 2481 NW BOCA RATON BOULEVARD , BOCA RATON , FL 33431 <br /> 561 . 391 . 8102 • FAX 561 . 391 . 9116 • COASTAL PLANNING & ENGINEERING , INC . , A CB & I COMPANY <br />