Laserfiche WebLink
BORRELLI f PARTNERS <br /> pR4t+ffi[CeYUdS P .RNNI MSi {: FND'iGp,W6NT$ RORS <br /> October 151h, 2013 <br /> Mr. Christopher J . Kafer, Jr., P.E. <br /> County Engineer <br /> Engineering Division <br /> 180127th Street (Building A) <br /> Vero Beach, FL 32960 <br /> Re; Fee Proposal for Additional Surveying Services for the Indian River County Intergenerational Rea-eation Facility at <br /> South County Regional Park, Vero Beady, Florida <br /> Dear Mr. Men <br /> Borrelli + Partners; Inc. (B+P) respectfully submit this scope and additional services fee proposal for the above referenced <br /> project for your review and consideration. <br /> The additional surveying services we are requesting; are as follows: <br /> As part of the preliminary stormwater design for the IRC intergenerational Recreation Center, Steve Moler and John Boyer, <br /> our Civil Engineers determined that existing utilities and stormwater facilities make connecting to the drainage canal (our <br /> site' s legal outfall) along the south side of Oslo Road unfeasible. Our project will need to outfall to an existing stormwater <br /> pond on the County-owned site to the east of the . South County Park site. <br /> in order to support the design of a stormwater pipe to connect to the existing pond (Pond 100 - see aerial in attached <br /> proposal) we will need additional topography of the adjacent site. <br /> The specific scope of services are as follows*. <br /> 1 . Recover existing horizontal and vertical control_ Elevations shall be based upon NAVD '88. <br /> 2. Obtain elevations on 50 foot grid within the project limits,. <br /> 3. Locate and obtain elevations on all visible improvements, including pavement, utilities, fences, etc. <br /> 4. Locate and obtain elevations of existing retention pond, including top of bank and toe slope. <br /> 5 . Locate and identify all trees., W or larger, as required by County code. <br /> 6. Integrate with existing topographic survey and prepare; updated topographic survey as necessary. <br /> 7. Upon completion, provide ten (10) signed and sealed copies and one digital file of the survey. <br /> NOT INCLUDEQ IN SCOPE OF SERWES. <br /> The following services are not included within our scope of services and fee proposal: <br /> A. Geotechnical Engineering services. <br /> 80 Environmental Consulting Services. <br /> C. Traffic Engineering f Studies. . <br /> D. Food Service Consultant. <br /> E, Audio Visual/Security/Communications Equipment Design [design incl, conduit only] .. <br /> Fe LEED Services I Commissioning. <br /> G. interior Design Services [incl. material selection boards, interior renderings, FF&E] . <br /> H. Public Presentations (other than noted herein) . <br /> i. Models or Renderings (other than noted herein) . <br /> J. Permit Review Fees. <br /> JAIME -E.. SORRE:I .L1 . AaA , NCARR : : JORGE A ... SORR'ELL1 , ASLA JIM BORRSL6.. 1 , CGC :.: JUDY A . CARTY, AIA <br />. NCARS <br /> ' N t a+sar Svee i , Orl:t8 dol Florijo 3280 <br /> uvts lrrcrtlrardt�st<cs.�.catrtt <br />