Laserfiche WebLink
EXHIBIT A <br /> PROJECTBUDGET: $5, 5000000.00 <br /> ESTIMATED <br /> CONSTRUCTION BUDGET: $41400'000.00 <br /> PROPOSED A/E FEE : $ 587,973.28 <br /> PERCENT OF <br /> CONSTRUCTION BUDGET: 13 .36% <br /> BREAKDOWN Of FEES : <br /> Pill <br /> IINCLU DES ARCITECTURAL SERVICES, LIMITED INTERIOR DESIGN, MEP/FP ENGINEERING, <br /> STRUCTURAL ENGINEERING AND LIMITEDAV/COMM. DESIGN) <br /> ARCHITECFURALFEE: $215, 789.52 4.89% INCL LIMITED INTERIOR DESIGN ANDSCHEMATIC- <br /> DESIGN FOR PH. 2 IMPROVEMENTS <br /> MEP/FP ENG . & <br /> STRUCTURAL ENG. FEE: $150,857.00 3.43% INCL LIMITED AV/CDMM. DESIGN <br /> • <br /> $366,146.52 8.32% <br /> [INCLUDES PROGRAMMING, CIVIL ENGINEERING, SURVEYING, LANDSCAPE DESIGN, <br /> IRRIGATION DESIGN AND COST ESTIMATINGI <br /> PROGRAMMING/MASTER INCL, DEVIL. OF MULTIPLE SITE PLAN <br /> DEVIL.PLANNING FEE: $18, 540.93 0.47% CONCEPTS/PROGRAMMING DOCUMENTS <br /> CIVIL ENG . FEE: INCL. CIVIL FOR EXTRA PARKING NOT REgUIREO BY <br /> $ 117, 130.00 2 .66% BLDG, TYPE/CNIL FOR LACROSSE FIELDS/CIVIL FOR <br /> PH. 2IMPROVEMENTS <br /> SURVEYING FEE: $ 17,755 .00 0.40% OPTIONAL FEE <br /> LANDSCAPE DESIGN FEE : $ 16,610.83 0.38% 'NCL. SCHEMATICDESIGNFDRPH, 2 <br /> IMPROVEMENTS <br /> IRRIGATION DESIGN FEE : $ 9,700.00 0. 229e <br /> COST ESTIMATING FEE : $42,090,00 0 96% MAY BE REDUCED IF CM IS BROUGHTON BOARD BY <br /> DD PHASE <br /> $221,826.76 5.04Y. <br /> • I ■ <br /> BORRELLI + PARTNERS, <br /> INC. : $ 15s258 -75 <br /> MASTELLER & MOLER : $5,000.00 <br /> TLC ENGINEERING : < r 000,00 <br /> $25,2S8.7S <br />