My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-201
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:14:43 AM
Creation date
10/1/2015 4:45:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/06/2012
Control Number
2012-201
Agenda Item Number
8.N.
Entity Name
Bridge Design Associates
Subject
Work Order No. 2
66th Ave. Bridge Replacements
Area
66th Ave. Bridge over 41st. St.
Supplemental fields
SmeadsoftID
11540
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES, INC. <br /> 26th Street Headwall <br /> October 10. 2012 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "E" <br /> CHIEF SENIOR FIELD TOTAL LABOR <br /> EINGfREER ENGMEER REP HOURS COST <br /> ACTMTY BY BY <br /> ACTIVITY ACTIVITY <br /> $150.00 $115.00 $70.00 <br /> Pre-Construction Meeting 1 .0 1 .0 20 $265.00 <br /> Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00 <br /> Sidewalks 16.0. 16.0 $1 , 120.00 <br /> Barriers 15.0 18.0 $1 , 120.oD <br /> Final Inspection 4.0 4.0 8.0 $880.00 <br /> Final Report & Certification 8.0 8.0 $1 ,200.00 <br /> TOTAL MANHOURS 21 .0 17.0 36.0 74.0 <br /> DIRECT LABOR :COST $3, 150.00 $1 ,955.00 $2,520.00 $73625.00 <br /> $7,625.00 <br /> S:\2005-Jobs105-619 Vero Bridges\Correspondsnes\EKNbit E 1Owl 0AZAs <br />
The URL can be used to link to this page
Your browser does not support the video tag.