My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-107
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:42:48 PM
Creation date
10/1/2015 2:11:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/04/2010
Control Number
2010-107
Agenda Item Number
8.K.
Entity Name
Bridge Design Associates
Subject
Work Order No.15
Area
1028 US1 to 53rd Street
Supplemental fields
SmeadsoftID
9657
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� K <br /> Board of County Commissioners, <br /> 1801 27th Street <br /> Vero Beach , Florida 32960 <br /> Telephone : (772) 567-8000 <br /> FAX : 772-778-9391 <br /> WORK ORDER NO . 15 (Engineering ) <br /> Resurfacing Old Dixie Highway from USI to 53rd Street <br /> IRC Project No . 1028 <br /> FOR <br /> PROFESSIONAL BRIDGE DESIGN SERVICES <br /> WITH <br /> Bridge Design Associates , Inc . <br /> This Work Order No . 15 is in accordance with the existing AGREEMENT dated October 3 , <br /> 2006 between Bridge Design Associates , Inc . (ENGINEER) and Indian River County <br /> (COUNTY) . <br /> This Work Order No . 15 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> Two (2 ) Old Dixie Highway box culvert extensions — Station 71 +25 and Station 101 +75 <br /> SECTION II — SCOPE OF SERVICES <br /> This Work Order No . 15 is for providing design and detailing for the above mentioned project . <br /> SECTION III - TIME FOR COMPLETION <br /> 60 calendar days per review . <br /> SECTION IV — COMPENSATION <br /> The COUNTY agrees to pay, and the ENGINEER agrees to accept , a fee for services <br /> rendered according to the " Scope of Services " identified in Section I1 and III of this Work <br /> Order No . 15 a lump sum fee of $ 10 , 955 . 00 . <br /> F :APublic Works\ENG IN EERING DIVISION PROJECTS\ 1028 - Resurfacing Old Dixie Hwy (US Ito 53rd St)\Admim\agenda items\BCC <br /> Bridge Design Work Order No. 15 04 -26- 10 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.