Laserfiche WebLink
e <br /> BRIDGE DESIGN ASSOCIATES. we. R9mflsucvzz <br /> OLD DIXIE HIGHWAY BOX CULVERTS AT STATIONS 175+05 & 182+80 <br /> May 21 , 2010 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT •A" <br /> CHIEFF1OR ENOIUM CAD TOTAL LABORENGINEREER INTERN TECHNICIAN HOURS COST <br /> ACTMTY <br /> By BY <br /> St45.OD $115.00 S8Q0D ACTMTY ACTMTY <br /> $80.00 <br /> Coordination Magilngs 3.0 <br /> $435,00 <br /> Site Visit <br /> 3.0 3.o $180.00 <br /> ml BOX CULVERT AT STATION 175+05 <br /> Foundation n 1.0 6.0 <br /> 7.0 $835.00 <br /> Wap Design & Headwall to 4.0 <br /> SA 5805.00 <br /> Top Desion 1.0 6.0 <br /> 7.0 $835.00 <br /> Plan / Elevation / Details 1.0 4.0 <br /> 20.0 25.0 32;205.00 <br /> Slope Probection <br /> 2.0 2.0 $230.00 ' <br /> BOX CULVERT AT STATION 192+80 <br /> $0.00 <br /> Foundadon Desi n 1.0 6.0 <br /> 7.0 $835.00 <br /> Wall Design & Headwall 1.0 4.0 <br /> 5.0 $sos.00 <br /> _lop Design 1 .0 8.0 <br /> 9.0 $ 10065.00 <br /> Plan 1 Elevation / Details t.o S.0 <br /> 20.0 27.0 $2,435.00 <br /> ,§iojLo Protwdon 20 <br /> 20 $230,00 <br /> TOTAL MANHOURS 11 .0 48.0 3.0 <br /> 40.0 89.0 <br /> DIRECT LABOR COST $1 ,596.00 $5,520.00 $180.00 $3,200.00 <br /> $10,495.00 <br /> $10,495.00 <br /> 5:12010-JaWl0-539A Old Dbde Box CuNW EADnslonVExblbit A 05.21 -10 <br />