My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-221
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 10:22:02 AM
Creation date
10/1/2015 2:26:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/14/2010
Control Number
2010-221
Agenda Item Number
8.L.
Entity Name
Bridge Design Associates
Subject
Work Order No. 23 Oslo Road Bridge project
Agreement December 1, 2009
Area
Oslo Road Bridge over 43rd Ave. Ditch
Project Number
0533
Supplemental fields
SmeadsoftID
9784
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. BRIDGE DESIGN ASSOCIATES, INC. <br /> OSLO ROAD OVER 43rd AVENUE DITCH <br /> ,August 20, 2010 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A" <br /> PROJECT PROJECT CARD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REPT HOURS COST <br /> ACTIVITY EJ. BY BY <br /> ACTMTY ACTIVITY <br /> $1450) $110.20 $80.00 $60.00 <br /> Pre Construction Meeting 5.0 5.0 10.0 $1 ,276.00 <br /> ShopDrawl Reviews 4-0 8.0 120 $1 ,461 .60 <br /> Demolition 4.0 8.0 720 51 ,060.00 <br /> Sidewalks 8.0 8,0 $480.00 <br /> Curbs 8 0 8.0 $480.00 <br /> Barriers 8.0 8.0 $480-00 <br /> Guardrails & Railings 8.0 8.0 $480.00 <br /> Final Inspection 5.0 5A 10'0 $19025.00 <br /> Final R & Certification 8.0 8A $1 , 160.00 <br /> TOTAL MANHOURS 1726.017110 0.0 45.0 84.0 <br /> DIRECT LABOR COST $31770.00 $1 ,43260 $0.00 $2,704.00 $77902.60 <br /> I � I <br /> ENGINEERING FEES $7790260 <br /> $:12008-Jobsm&SW Oslo Road over 43rd Avemie dftM%orresPon� 0136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.