Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES , INC . <br /> OSLO ROAD BRIDGE WIDENING OVER LATERAL " B" CANAL <br /> CONSTRUCTION PHASE SERVICES <br /> July 15 , 2011 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "B" <br /> PROJECT PROJECT FIELD REP CAD TOTAL LABOR <br /> MANAGER ENGINEER E,I, TECHNICIAN HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $145.00 $115.00 $60.00 $80 00 <br /> Pre Construction Meeting 5.0 5.0 10. 0 $ 11025. 00 <br /> Shop Drawing Reviews ! concrete mix, test pile <br /> re-cast components 20 16. 0 16.0 34. 0 $3,090. 00 <br /> Pile Casting I Sheet Piles 40. 0 40. 0 $23400.00 <br /> Pile Driving 40. 0 40.0 $2, 400.00 <br /> Pile Cas 160 16 . 0 $960. D0 <br /> Prestressed Placement I Closure Pour 6.0 60 $360. 00 <br /> Post Tensioning 2.0 2.0 8. 0 12.0 $ 1 ,000. 00 <br /> Sidewalk 8.0 8. 0 $480. 00 <br /> Barriers 8.0 8.0 $480. 00 <br /> Approach Slab 12.0 12. 0 $720. 00 <br /> Approach Slabs sidewalks 16.0 16.0 $960. 00 <br /> Approach Slab barriers 24 .0 24 .0 $11440.00 <br /> Revetment 8.0 8. D $480. 00 <br /> Final Inspection 4. 0 4.0 8.0 $820.00 <br /> Final Report & Certification 4. 0 4.0 1 $580.00 <br /> 0. 0 $0. 00 <br /> 0.0 $0. 00 <br /> TOTAL MANHOURS F 17.0 18.0 211 . 0 0.0 246. 0 <br /> DIRECT LABOR COST $21465. OD $2,070.00 $ 12,660. 00 $0. 00 $17, 195. 00 <br /> NOTe: Concrete testing is not included ENGINEERING FEEES $ 17, 195 . 00 <br /> GIRL TEST PILE $5#000, 00 <br /> TOTAL FEES $22, 195.00 <br /> S\2011 -Jobs\Proposals\Oslo Rd & 58th\proposal Exhibit B <br />