Laserfiche WebLink
SECTION III - SCOPE OF SERVICES <br /> The ENGINEER agrees to perform design and construction services in connection with the project as required and <br /> set forth in the following : <br /> A . General : <br /> 1 . After issuance of written authorization to proceed , the ENGINEER shall consult with <br /> the COUNTY to clarify and define the COUNTY' S requirements for the project and <br /> review available data . <br /> 2 . The ENGINEER will design the widening of the existing Oslo Road Bridge over the <br /> I . R . F . W . C . D Lateral B Canal at 58 `" Avenue . The widening shall be to the north side <br /> and will accommodate the proposed lane configuration for Oslo Road . <br /> 3 . The ENGINEER will prepare permitting applications , calculations , plans and other <br /> supporting documents required to obtain the Agency permits . <br /> 4 . The ENGINEER will prepare construction drawings for the widening of the Oslo <br /> Road Bridge over the I . R . F . W . C . D Lateral B Canal . <br /> 5 . The ENGINEER will provide Construction Engineering and Inspection Services <br /> during the construction of Oslo Road Bridge over the I . R . F . W . C . D Lateral B Canal and <br /> certify to all permitting agencies that the construction of the bridge widening was <br /> performed in accordance with the approved construction drawings . <br /> 6 . The ENGINEER will attend conferences with the COUNTY and its representatives <br /> upon reasonable request . <br /> SECTION IV - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this <br /> Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> The basic compensation mutually agreed upon by the ENGINEER and the COUNTY is as follows , and as <br /> shown on Exhibit l : <br /> TASKS COST <br /> Part 1 Design and Permitting (LUMP SUM) . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . $ 269185 <br />.00 <br /> Part 2 Plan Sheets (LUMP SUM) . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . $ 189250 .00 <br /> Construction Phase (HOURLY NOT TO EXCEED) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 22 , 195. 00 <br /> TOTAL 66,630 .00 <br /> SECTION V - PARTIAL PAYMENTS <br /> The COUNTY shall make monthly partial payments to the ENGINEER based upon a percent complete actual <br /> effort on hourly components as identified in this Agreement and Exhibit A. Payment shall be made pursuant to the <br />Florida <br /> Page 2 of 6 <br /> C : ADocuments and Settings\brianr\Local Settings\Temporary Internet Files\Content. Outlook\H ICJ6HAP\BDA <br /> AGREEIVIENT . doc <br />