My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-195
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 1:54:03 PM
Creation date
10/1/2015 2:51:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/06/2011
Control Number
2011-195
Agenda Item Number
8.S.
Entity Name
Bridge Design Associates, Inc.
Subject
Widen Oslo Road Bridge Engineering services
Area
I.R.F.W.C.D. Lateral B Canal at 58th Ave.
Project Number
0517
Supplemental fields
SmeadsoftID
10202
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As to CITY <br /> City of Boca Raton <br /> Municipal Services <br /> 2500 N.W . 1st Avenue <br /> Boca Raton, Florida 33431 <br /> Attention: Robert J. DiChristopher, P. E ., Director, Engineering Services <br /> As to CONSULTANT : <br /> Bridge Design Associates, Inc . <br /> P . O . Box 210173 <br /> West Pahn Beach, Florida, 33421 -0173 <br /> Phone No . (561 ) 753-0816 <br /> Facsimile (561 ) 753-0816 <br /> Attention: Brian C. Rheault, P. E ., President <br /> Notices shall be effective when received at the address specified above . Changes in the respective addresses to <br /> which such notice may be directed may be made from time to time by any party by written notice to the <br /> other <br /> party . Facsimile is acceptable notice effective when received, however, facsimiles received (i.e . ; printed) after 5 : 00 <br /> p . m . or on weekends or holidays, will be deemed received on the next business day. The original of the notice <br /> must additionally be mailed as required herein . <br /> Nothing contained in this Article shall be construed to restrict the transmission of routine communications <br /> between representatives of CONSULTANT and CITY. <br /> ARTICLE 21 - PROJECT TEAM <br /> The Project Team shall consist of <br /> Brian C . Rheault, P . E . <br /> Denise L . Burton , P . E . <br /> Jason C . Hukanch , P . E . <br /> Mark E . Ritayik <br /> Craig A . Burkhardt <br /> Project Team members may be changed only with the prior written approval of the City . <br /> 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.