Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES , INC . <br /> OSLO ROAD BRIDGE WIDENINGOVER LATERAL "B" CANAL <br /> July 15, 2011 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A" PART 1 <br /> PROJECT PROJECT ENGINEER CAD TOTAL LABOR <br /> MANAGER ENGINEER INTERN TECHNICIAN HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $145.00 $ 115.00 $90.00 $80.00 <br /> DESIGN TASKS <br /> Review Soils Data 2.0 20 $230.00 <br /> Design Pile Foundation System 20 16. 0 18.0 $13730.00 <br /> Design Sheet Pile System 1 .0 4.0 8.0 130 $13325.00 <br /> Design End Bents & Wing Walls 2.0 4.0 &0 14.0 $13470.00 <br /> Design Intermediate Bents 2.0 4.0 8. 0 14.0 $1 ,470.00 <br /> Design Deck Slabs 4 Types 2.0 16. 0 32. 0 50. 0 $5,010.00 <br /> Design median 2. 0 4. 0 8.0 14. 0 $1 ,470. 00 <br /> Design Sidewalk 2. 0 4. 0 8. 0 14. 0 $ 1 ,470. 00 <br /> Design Closure Pours 2.0 4. 0 8. D 14. 0 $ 1 ,470. D0 <br /> Design Transverse Post-Tensioning 2.0 4. 0 &0 14.0 $11470.00 <br /> Design Approach Slab Connections 2.0 4. 0 8. 0 140 $1 ,470.00 <br /> PREPARE PERMIT APPLICATIONS & MEETINGS 0. 0 $0.00 <br /> Indian River Farms Water Control District 4. 0 8.0 4. 0 16.0 $13500. 00 <br /> Army Corps of Engineers 4. 0 80 4 .0 16.0 $1 ,500. 00 <br /> St. John's Water Control District 4. 0 8. 0 4. 0 16.0 $17500. 00 <br /> 0.0 $0.00 <br /> Meetings & Coordination with Indian River County 8.0 80 $11160.00 <br /> Load Ratin2 of Bride 4. 0 8. 0 4. 0 1 .0 17.0 $1 ,940.00 <br /> 0.0 $0. 00 <br /> TOTAL MANHOURS 310 70. 0 140.0 13. 0 254. 0 <br /> DIRECT LABOR COST $41495.00 $81050.00 $12,600.00 $1 , 040. 00 $261185.00 <br /> $26, 165.00 <br /> S\2011 -Jobs\Proposals\Oslo Rd & 58th\proposal design 07-15-11 <br />