Laserfiche WebLink
Task 2.1- Financial Assurance Report <br />CDM will prepare documentation that demonstrates proof of financial assurance for the cost of <br />closing and providing long-term care for the Class I Landfill, the C&D Debris Landfill, and the <br />Waste Tire Processing Center. This documentation will be submitted for review by the SWDD <br />and the IRC Finance Department. Six copies of the final document will be provided to SWDD. <br />CDM will meet with SWDD up to six times to discuss issues and to provide needed <br />coordination. CDM will also respond to FDEP correspondence regarding financial assurance. <br />Task 2.2 - Survey and Airspace Assessment <br />CDM will provide surveys and assessments of consumed airspace, performed by Masteller, <br />Moler, Reed & Taylor, Inc. for the Class I and C&D Landfills. The survey work for the Class I <br />waste area will include a complete topographic survey of Segments I and II as well as the <br />ditches and roadways surrounding the Class I area. The topographic survey of the C&D <br />Landfill site will include the waste area, as well as the fence -line and the surrounding ditches <br />and berms adjacent to the C&D site and the C&D expansion area. CDM will review the <br />volumetric modeling and include a summary of estimated waste density based on the results of <br />the survey and volumetric modeling. <br />The deliverable from Masteller, Moler, Reed & Taylor, Inc. will consist of a survey identifying <br />the dates the field survey was completed. Airspace consumed and remaining airspace based on <br />the survey and the construction and design criteria shall be specifically identified in the <br />financial assurance report. The survey shall also include the results of the volumetric <br />calculations for the Segment II portions of the Class I landfill, as well as the C&D Landfill and <br />the new C&D expansion area. Deliverables accompanying the survey shall include: <br />A 1 -inch = 50 feet scale contour map for each site with 1 -foot contour intervals in regular weight <br />lines, and 5 -foot contour intervals in bold weight lines. Signed and sealed contour maps will be <br />provided on 24 -inch by 36 -inch paper of each landfill site in 1 -inch = 200 feet scale. A CD with <br />ASCII file of the survey data in AutoCAD 2004 will also be provided. <br />For the Class I Landfill (Segment I and II), the financial assurance report shall include an <br />evaluation of the compaction of the waste and an analysis as to whether Waste Management <br />Inc. is meeting its contractual compaction requirements. CDM will include escrow account <br />balance recommendations for Fiscal Year 2009-2010, as well as escrow account budget <br />recommendations for Fiscal Year 2010-2011. <br />B-2 j12568.docm <br />