Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF PROFESSIONAL SERVICES <br /> AMENDMENT NO . 3 <br /> INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br /> OSLO CUSTOMER CONVENIENCE CENTER DESIGN , PERMITTING, AND CONSTRUCTION SERVICES <br /> The Indian River County Solid Waste Disposal District ( IRC SWDD ) currently operates a residential <br /> collection/ recycling customer convenience center (CCC) at the former Oslo Landfill site . In an effort <br /> to provide an increased level of service to its residents , IRC SWDD is proposing to build a new CCC <br /> at the Oslo site to replace the existing facility. The existing CCC will remain operational until the <br /> new facility is complete . The proposed new facility will be constructed over the old Oslo solid waste <br /> dump site . <br /> The proposed improvements include paved access roads and parking/ drive areas , attendant office, <br /> covered household hazardous waste and oil collection/ storage area, restroom facilities, and a <br /> retention pond for stormwater treatment and attenuation . Stationary compactors with enclosed <br /> roll - off storage containers are proposed to be used to transport municipal solid waste (MSW) to the <br /> landfill . Open top roll - off containers will be used to transport cardboard, paper, mixed recyclables , <br /> yard waste, recyclable metals, and tires to the landfill for processing. Household hazardous waste <br /> ( HHW) will be collected at the proposed covered HHW and oil collection /storage area . <br /> This amendment includes additional engineering services for the re - design and re - permitting of the <br /> new Oslo CCC based on a " flat" on grade - type facility that utilizes stationary compactors for MSW <br /> and open top roll - off containers for cardboard, paper, mixed recyclables , yard waste, recyclable <br /> metals , and tires . The additional Scope of Services for this project is described below. <br /> SCOPE OF SERVICES <br /> Camp Dresser & McKee Inc . ( CDM ) will undertake the design, permitting, bidding, and construction <br /> oversight of the new Oslo CCC . Based on recent discussions with IRC staff and our brief review of <br /> the existing information, we understand the work to include the following items : <br /> PHASE I - DATA COLLECTION , DESIGN, PERMITTING, AND BIDDING <br /> ® Data Review, Collection, and Evaluation <br /> ■ Design Services <br /> m Permitting Assistance <br /> ■ Bidding Services <br /> ■ Project/ Quality Management <br /> PHASE II - CONSTRUCTION SERVICES <br /> ■ General Engineering Services <br /> ■ Special Engineering Services <br /> A- 1 j13215_Revi5ed .doc <br />