Subtask 2 . 8 Responses to Request for Additional Information <br /> It is anticipated that the FDEP, IRC Planning and Zoning Department, and the IRC Health <br /> Department may request additional information to evaluate the design and supporting permit <br /> application material . CDM 's budget provides for preparation of one set of responses for additional <br /> information from FDEP (water main extension) , IRFWCD (drainage connection permit) , and IRC <br /> (septic system and site plan) under this task. It is anticipated that this will require about 30 days <br /> depending on the number and complexity of the comments . Responses to comments will be in the <br /> form of letter reports with attached supplemental information . <br /> Subtask 2 . 12 IRC Stormwater Management System Permit <br /> CDM will prepare and submit a modification to the IRC Stormwater Management Permit that was <br /> previously issued, which is required to construct the stormwater management system . <br /> TASK 3 . 0 - BIDDING SERVICES <br /> In this task, CDM will assist IRC SWDD in obtaining bids for the construction of the project, assist <br /> IRC SWDD in evaluating the bids and in assembling and awarding the contract, and will arrange and <br /> preside over a prebid and a preconstruction conference . <br /> n CDM will provide 10 sets of drawings and contract documents to IRC SWDD . IRC SWDD will <br /> advertise for bids, and provide the documents to prospective bidders . <br /> ® CDM will coordinate the advertisement of the bid, respond to the communications from <br /> Contractors , and issue addenda, as necessary. CDM will also conduct a pre - bid meeting for <br /> interested Contractors . <br /> ® CDM will prepare a detailed final opinion of probable cost. <br /> ® CDM will attend the bid opening, evaluate bids, and recommend a bidder for Award of Contract <br /> to IRC SWDD . <br /> n After issuance of a Notice to Award by IRC SWDD , CDM shall assist IRC SWDD in preparing the <br /> construction contract, request and review information from the Contractor, and advise IRC <br /> SWDD on finalizing the contract. <br /> ■ CDM will arrange for a preconstruction conference to be attended by the Contractor, IRC SWDD, <br /> other interested parties, and CDM 's representatives . Preconstruction conference minutes will <br /> be prepared and distributed to all attendees . The Notice to Proceed will be prepared by CDM <br /> for issuance to the Contractor. The bidding phase of the project terminates at the issuance of <br /> the Notice to Proceed . <br /> TASK 4 . 0 - PROJECT/ QUALITY MANAGEMENT <br /> Activities performed under this task consist of those generally administrative functions required to <br /> assure that the project remains on schedule, within budget, and that the quality of the work <br /> products defined within this scope is consistent with CDM 's standards and IRC SWDD ' s <br /> expectations . Specific activities included are identified below : <br /> Subtask 4 . 1 Project Update Meetings <br /> CDM ' s project manager will prepare for and attend status reporting meetings throughout the life of <br /> the project. It is estimated that meetings will be held on the average of once a month . <br /> A - 7 j13215_Revised .doc <br />