My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-115
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 11:08:49 AM
Creation date
10/1/2015 2:11:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/04/2010
Control Number
2010-115
Agenda Item Number
15.B.3
Entity Name
Camp Dresser and McKee (CDM)
SWDD
Subject
Work Order No.15 Phase 1 Surface Groundwater
Supplemental fields
SmeadsoftID
9663
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° Background information including results of previous investigations and monitoring. <br /> ° A description of investigation including well installation and sampling methods and <br /> locations . <br /> ° Summary tables of well construction details, groundwater analytical results (including <br /> historical data) , water-level data, and survey results . <br /> ® The laboratory data in Automated Data Processing Tool format. <br /> ® A site plan showing the location of groundwater wells, groundwater contour maps, and <br /> applicable groundwater isoconcentration maps . <br /> ® Evaluation of surface water quality data with respect to numerical criteria established by <br /> FDEP in Chapter 62-302, F . A . C . <br /> ® Conclusions and recommendations . The recommendations will be based on results of <br /> the investigations and regulatory requirements for corrective actions or monitoring, as <br /> appropriate . If corrective actions are determined to be necessary, the optimum corrective <br /> measure will be determined during a feasibility analysis that will be part of Phase 11 of <br /> this project. <br /> A draft report will be provided to SWDD for review and comment. Comments will be resolved <br /> and the report will be finalized and submitted to FDEP . Included in this task are two meetings <br /> with SWDD and one meeting with FDEP in Orlando . <br /> PROTECT SCHEDULE <br /> The scope of services shall be completed within 80 days from receipt of the fully executed <br /> contract. <br /> Task 1 Within 4 weeks of notice to proceed . <br /> Task 2 Within 4 weeks from Monitoring Plan Approval by FDEP . <br /> Task 3 Within 3 weeks after receipt of lab data in Task 2 . <br /> PAYMENT AND COMPENSATION <br /> Payments for services presented herein shall be made on the basis of a Not- to-Exceed fee . The <br /> total Not- to-Exceed fee for Tasks 1 through 3 is $82, 122 . A breakdown of the budget is shown in <br /> Exhibit B . <br /> cm A-3 112767 docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.