Laserfiche WebLink
Tire Processing Center. This documentation will be submitted for review by the SWDD and IRC <br /> Finance Department. Four copies of the final document will be provided to SWDD . CDM will meet <br /> with SWDD up to four times to discuss issues and to provide needed coordination . CDM will also <br /> respond to FDEP correspondence regarding financial assurance . <br /> Task 2.2 — Survey and Airspace Assessment <br /> CDM will provide surveys and assessments of consumed airspace, performed by Masteller, Moler, <br /> Reed & Taylor, Inc . for the Class I and C &D Landfills . The survey work for the Class I waste area will <br /> include a complete topographic survey of Segments I and II as well as the ditches and roadways <br /> surrounding the Class I area . The topographic survey of the C &D Landfill site will include the waste <br /> area, as well as the fence- line and the surrounding ditches and berms adjacent to the C &D site and <br /> the C &D expansion area. CDM will review the volumetric modeling and include a summary of <br /> estimated waste density based on the results of the survey and volumetric modeling. <br /> The deliverable from Masteller, Moler, Reed & Taylor, Inc. will consist of a survey identifying the <br /> dates the field survey was completed . Airspace consumed and remaining airspace based on the <br /> survey and the construction and design criteria shall be specifically identified in the financial <br /> assurance report. The survey shall also include the results of the volumetric calculations for the <br /> Segment II portions of the Class I landfill, as well as the C &D Landfill and the new C &D expansion <br /> area . Deliverables accompanying the survey shall include : <br /> A 1 - inch = 50 feet scale contour map for each site with 1400t contour intervals in regular weight <br /> lines, and 5400t contour intervals in bold weight lines . Signed and sealed contour maps will be <br /> provided on 24 - inch by 3 & inch paper of each landfill site in 1 - inch = 200 feet scale . A Compact Disc <br /> ( CD) with ASCII file of the survey data in AutoCAD 2004 will also be provided. <br /> For the Class I Landfill (Segment I and II ) , the financial assurance report shall include an evaluation <br /> of the compaction of the waste and an analysis as to whether Republic Services is meeting its <br /> contractual compaction requirements . CDM will include escrow account balance recommendations <br /> for Fiscal Year 2011 - 2012 , as well as escrow account budget recommendations for Fiscal Year <br /> 2012 - 2013 . <br /> A - 2 j13408.docx <br />