My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-006
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 1:54:22 PM
Creation date
10/1/2015 1:28:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
01/11/2011
Control Number
2011-006
Agenda Item Number
15.B.1
Entity Name
Camp Dresser and McKee Inc
Subject
Compliance Monitoring and Reporting
2011 Work Order 13 Amendment No.1
Area
Indian River County Landfill
Supplemental fields
SmeadsoftID
9141
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
groundwater monitor wells and staff gauge prior to the sampling event. CDM / ITS will also <br /> perform semi-annual (January and July) sampling of the two surface water sites for analysis of <br /> the list of Semi -Annual Surface Water Parameters presented as Attachment G of the MPIS <br /> (Permit No . S031 - 0128769-018) and annual leachate sampling from the leachate monitoring site <br /> for analysis of the list of Annual Leachate Parameters presented as Attachment H of the MPIS <br /> (Permit No . S031 -0128769-018) . Sampling of new leachate monitoring sites required by Permit <br /> Nos . SC31 - 0128769-019' and S031 -0128769- 020 are not included this Scope of Services . It is <br /> estimated that data collection and sampling will take four days to complete per sampling event . <br /> In the event that FDEP requires resampling of groundwater monitoring wells, the labor and <br /> materials will be invoiced under Task 4 of this Scope of Services . If the resampling is the result <br /> from errors made by the sampling staff, IRC will not be invoiced . CDM/ ITS will deliver the <br /> samples to the ENCO Orlando office for analysis . <br /> ENCO will perform the laboratory analysis under IRC SWDD' s contract. CDM will assist IRC <br /> SWDD in coordinating the analytical testing activities with ENCO, notify FDEP prior to <br /> sampling as required by the MPIS, review and evaluate the analytical test results, and prepare <br /> the semi-annual reports . <br /> CDM will prepare two semi-annual reports that will be submitted to FDEP within 60 days of <br /> receipt of valid laboratory results from the laboratory that is contracted by IRC SWDD to <br /> analyze samples . Services included in preparing the semi-annual reports include : <br /> ■ Review of laboratory result with respect to FDEP groundwater quality criteria and historical <br /> laboratory results . If review of the data indicates potential errors in the results or <br /> concentrations of analyses that could potentially result in enforcement action, CDM will <br /> notify IRC SWDD prior to preparing the report and request confirmatory samples, if needed . <br /> ■ Preparation of semi-annual monitoring reports for the January and July monitoring events . <br /> The reports will include brief discussions of the results, water level contour maps, and copies <br /> of the analytical reports . A draft report will be submitted for review, if requested . <br /> ■ CDM will prepare three copies of the final report for submittal to FDEP and will provide one <br /> file copy to IRC SWDD <br /> IRC SWDD will provide copies of analytical reports in electronic format (AdApt, or other <br /> electronic format accepted by FDEP) . <br /> TASK 3 . 0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br /> Title V Permit No . 0610015-003- AV contains monitoring and reporting requirements related to <br /> the landfill gas collection and control system . CDM will assist IRC SWDD, as described below, <br /> in fulfilling all air permit requirements and conditions within the required regulatory <br /> timeframes . <br /> Statement of Compliance <br /> CDM will prepare and submit the annual Statement of Compliance for the IRC Landfill . This <br /> document must be submitted to FDEP within 60 days after the end of the calendar year, as <br /> required by Rule 62-213 . 440 (3) (a) (2) , F . A . C . <br /> A-3 <br /> j13028 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.