Laserfiche WebLink
groundwater monitor wells and staff gauge prior to the sampling event. CDM / ITS will also <br /> perform semi-annual (January and July) sampling of the two surface water sites for analysis of <br /> the list of Semi -Annual Surface Water Parameters presented as Attachment G of the MPIS <br /> (Permit No . S031 - 0128769-018) and annual leachate sampling from the leachate monitoring site <br /> for analysis of the list of Annual Leachate Parameters presented as Attachment H of the MPIS <br /> (Permit No . S031 -0128769-018) . Sampling of new leachate monitoring sites required by Permit <br /> Nos . SC31 - 0128769-019' and S031 -0128769- 020 are not included this Scope of Services . It is <br /> estimated that data collection and sampling will take four days to complete per sampling event . <br /> In the event that FDEP requires resampling of groundwater monitoring wells, the labor and <br /> materials will be invoiced under Task 4 of this Scope of Services . If the resampling is the result <br /> from errors made by the sampling staff, IRC will not be invoiced . CDM/ ITS will deliver the <br /> samples to the ENCO Orlando office for analysis . <br /> ENCO will perform the laboratory analysis under IRC SWDD' s contract. CDM will assist IRC <br /> SWDD in coordinating the analytical testing activities with ENCO, notify FDEP prior to <br /> sampling as required by the MPIS, review and evaluate the analytical test results, and prepare <br /> the semi-annual reports . <br /> CDM will prepare two semi-annual reports that will be submitted to FDEP within 60 days of <br /> receipt of valid laboratory results from the laboratory that is contracted by IRC SWDD to <br /> analyze samples . Services included in preparing the semi-annual reports include : <br /> ■ Review of laboratory result with respect to FDEP groundwater quality criteria and historical <br /> laboratory results . If review of the data indicates potential errors in the results or <br /> concentrations of analyses that could potentially result in enforcement action, CDM will <br /> notify IRC SWDD prior to preparing the report and request confirmatory samples, if needed . <br /> ■ Preparation of semi-annual monitoring reports for the January and July monitoring events . <br /> The reports will include brief discussions of the results, water level contour maps, and copies <br /> of the analytical reports . A draft report will be submitted for review, if requested . <br /> ■ CDM will prepare three copies of the final report for submittal to FDEP and will provide one <br /> file copy to IRC SWDD <br /> IRC SWDD will provide copies of analytical reports in electronic format (AdApt, or other <br /> electronic format accepted by FDEP) . <br /> TASK 3 . 0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br /> Title V Permit No . 0610015-003- AV contains monitoring and reporting requirements related to <br /> the landfill gas collection and control system . CDM will assist IRC SWDD, as described below, <br /> in fulfilling all air permit requirements and conditions within the required regulatory <br /> timeframes . <br /> Statement of Compliance <br /> CDM will prepare and submit the annual Statement of Compliance for the IRC Landfill . This <br /> document must be submitted to FDEP within 60 days after the end of the calendar year, as <br /> required by Rule 62-213 . 440 (3) (a) (2) , F . A . C . <br /> A-3 <br /> j13028 . doc <br />