My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-130
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 12:59:23 PM
Creation date
10/1/2015 2:14:41 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
05/18/2010
Control Number
2010-130
Agenda Item Number
12.J.1.
Entity Name
Carollo Engineers
Subject
Scaling and Corrosion Reverse Osmosis Facilities
Task Order No. 1
Supplemental fields
SmeadsoftID
9693
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. p <br /> Subtask 1 . 2 Chemistry Modeling <br /> a . Evaluate scaling/corrosion indices under current operation <br /> b . Determine conditions for recommended operation <br /> c . Draft letter memorandum summarizing modeling results <br /> d . Final letter memorandum summarizing modeling results <br /> Subtask 1 . 3 Sampling and Analysis <br /> a . Sampling protocol <br /> b . Sampling and coordination <br /> c . Sample Analysis <br /> d . Deposits/scale sampling and coordination <br /> e . Deposits/scale analysis <br /> Task 1 Deliverables : Draft Letter Memorandum ( electronic copy PDF format ) <br /> Final Letter Memorandum ( electronic copy PDF format ) <br /> TASK 2 . REPORT <br /> Subtask 2 . 1 . Draft Report <br /> At the completion of the data reviews and evaluation (Task 1 ) , ENGINEER will produce a Draft <br /> Report summarizing and documenting the results of the evaluations and including suitable <br /> recommendations , and distribute the draft report to the OWNER for review and approval . <br /> Subtask 2 .2 . Meeting to discuss draft report ( Prep/Attend/ Distribute Minutes ) <br /> After the submission of the draft report, ENGINEER will meet with OWNER to discuss the <br /> results and recommendations included in the draft report . OWNER' s comments will be received , <br /> and incorporated in the finalization of the report . <br /> Subtask 2 . 3. Final Report <br /> The ENGINEER will revise the Draft Report as appropriate based on the OWNER ' s comments <br /> received , and submit a Final Report . <br /> Task 2 Deliverables : Draft Report ( 4 copies ) <br /> Final Report ( 4 copies ) <br /> TIME OF PERFORMANCE <br /> Completion of the services outlined above will be provided as needed during the project . The <br /> overall schedule for the preparation of the Report is estimated to be fourteen ( 14) weeks after . <br /> receipt of the Notice to Proceed ( NTP ) . The estimated timeline is described below . <br /> • Task 1 . 1 and 1 . 2 of the study will delivered to the OWNER within seven weeks of <br /> receipt of the NTP . <br /> • Task 1 . 3 and Task 2 of the study will be delivered to the OWNER within fourteen weeks <br /> of receipt of the NTP . <br /> H :1Clientllndian River County\ContracAIRC 2010-T01 _Fn1 .doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.