My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-155
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2016 1:49:36 PM
Creation date
10/1/2015 4:38:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/11/2012
Control Number
2012-155
Agenda Item Number
8.Q.
Entity Name
Carter Associates
Subject
Amendment No. 18
66th Avenue Paving and Drainage Improvements Phase2
Area
4th Street and 16th Street
Project Number
9810B
Supplemental fields
SmeadsoftID
11408
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . Produce and provide digital CD and hard copy of revised Plan/Profile and Quantity sheets to <br /> County . <br /> 5 . Prepare FDEP Permit Application and Provide $ 650 Application Fee . <br /> 6 . Provide inspection of materials , conflict crossings , sample point locations and final pressure <br /> test . The day to day inspection and assurance of construction complying with County <br /> standards shall be performed by the County <br /> 7 . Perform FDEP certifications of completed , FDEP permitted facilities only . <br /> Compensation .• <br /> The estimated costs to provide the above stated additional services are as follows : <br /> • Design and Drafting $ 1 , 000 . 00 <br /> • Quantity Take Off and Drafting $ 340 . 00 <br /> • Prepare and Send Deliverables $ 50 . 00 <br /> • Permitting ( 1 new permit) $ 420 . 00 <br /> • Permit Application Fee $ 6 .50 . 00 <br /> • Inspection ( 14 hours ) $ 910 . 00 <br /> • FDEP Certifications (Prev . Included ) $ 0 . 00 <br /> Total = $ 3 ,370 . 00 <br /> Amendment No . l additional services shall be invoiced on a time and materials basis , with a not to <br /> exceed total cost of $ 3 , 370 . 00 . <br /> Please feel free to contact me should you have any questions or conceals regarding our proposed <br /> scope of work or terms of agreement . <br /> Sincerely , <br /> Carter Associates , Inc . <br /> Patrick Walther, P . E . <br /> Principal/Secretary/Project Manager <br /> sds <br /> cc : Gordon Sparks , P . E . — IRC Utilities <br /> Michael Nixon , Y . E . — IRC Engineering <br /> Steve Snoberger, P . E . - CAI <br /> t scro iNis; Aniirl, i <br /> N : \SDS\09-63E ( IRC 66th Ave Water Adjustments)\Proposal (s)\Amendment # 1 to WorkOrder2 . doc i � ;iru ( , N1 I <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.