Laserfiche WebLink
6. Prepare FDEP Permit Application, with County to provide the $650 Application Fee. <br /> 7. Provide inspection of materials, conflict crossings, aerial crossing, sample point locations and final <br /> pressure test. The day to day inspection and assurance of construction complying with State and <br /> County standards shall be performed by the County Utility Inspector. <br /> 8 . Perform FDEP certification of completion, for FDEP permitted facilities only. <br /> Compensation* <br /> The estimated costs to provide the above stated additional services are as follows : <br /> 1 . Design and draft 3 ,000± LF of Buried 84nch Main $ 3,000 .00 <br /> 2. Design and draft Drainage Crossings $ 12600.00 <br /> 3 . Design and detail Aerial Bridge Crossing and Approaches $ 12800.00 <br /> 4. Prepare Quantity Take Off and Table $ 700.00 <br /> 5 . Prepare and Transmit Deliverables (Design and As-Builts) $ 250.00 <br /> 6. FDEP Permitting ( 1 new permit) $ 650 .00 <br /> 7 . Inspection (28 hours) $ 2,300 .00 <br /> 8. Inspection Administration $ 560.00 <br /> 9 . FDEP Certification ( 1 permit) 560.00 <br /> Total = $ 119420.00 <br /> Amendment No. 19 additional services shall be invoiced on a time and materials basis, with a lump sum total <br /> cost of $ 11 ,420.00. <br /> Please feel free to contact me should you have any questions or concerns regarding our proposed scope of <br /> work or terms of agreement. <br /> Sincerely, <br /> er late ce <br /> David E. Luethje, PSM <br /> Principal./Vice-President <br /> sds <br /> cc: Michael Nixon, P.E. — IRC Engineering <br /> Gordon Sparks, P.E. — IRC Utilities <br /> Steve Snoberger, P.E. - CAI <br /> %? A Sce Florida <br /> ,(�► Since 1911 <br /> N :\PSW\P\98-23E\Agreements\Amendmentl9 Proposal &2143 .doc Page 2 of 2 <br />