My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-236
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:52:46 AM
Creation date
10/1/2015 2:29:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/05/2010
Control Number
2010-236
Agenda Item Number
8.K.
Entity Name
Carter Associates INC
Subject
Amendment No. 12 Paving and Drainage Improvements
Area
66th Ave. between 4th St. and SR 60
Project Number
9810
Supplemental fields
SmeadsoftID
9821
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 1b 3 <br /> AMENDMENT NO . 12 TO THE PROFESSIONAL <br /> ENGINEERING SERVICES AGREEMENT <br /> 66T " AVENUE PAVING AND DRAINAGE IMPROVEMENTS <br /> BETWEEN 4" 11 STREET AND SR60 <br /> IRC PROJECT NO . 9810 <br /> THIS is an amendment to the existing AGREEMENT dated NOVEMBER 17 , 1998 , including <br /> AMENDMENTS NUMBER I through 11 , between CARTER ASSOCIATES , INC . (ENGINEER) and <br /> INDIAN RIVER COUNTY ( COUNTY) . The proposed scope of work includes surveying, design <br /> modifications and permitting . All provisions of the original Professional Engineering Services Agreement <br /> including Amendment Nos . 1 through 11 shall remain in frill force and effect, unless otherwise specifically <br /> modified . This amendment addresses changes in " SCOPE OF SERVICES " , "COMPENSATION" and <br /> "TIME OF COMPLETION" of the AGREEMENT . <br /> SCOPE OF SERVICES <br /> See attached letter from Carter Associates , Inc . dated December 8 , 2009 , which specifies changes in the <br /> " SCOPE OF SERVICES " and " COMPENSATION" and "TIME FOR COMPLETION . " <br /> COMPENSATION <br /> This section of the AGREEMENT entitled SECTION V - COMPENSATION shall be revised in <br /> response to the Scope modifications set out herein . The charges associated with this AMENDMENT NO . 12 <br /> are as follows : <br /> Survey, Design Modifications and Permitting Lump Sum Amount $ 235700 . 00 <br /> Time and Materials Not —to - exceed total $ 93830 . 00 <br /> TOTAL Amendment No . 12 $ 335530 . 00 <br /> The charges associated with the AGREEMENT (which include changes from Amendments 1 through 11 and <br /> these additional services included in proposed Amendment 12 ) , shall be increased from $ 588 ,295 . 00 to <br /> $ 6215825 . 00 . . <br /> C:\Documents and SettingsTaMLocal Settings\Temporary Internet Files\OLK19\9810 Amendment 12 09-22- IO . docl <br />
The URL can be used to link to this page
Your browser does not support the video tag.