My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-053
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:23:39 AM
Creation date
10/1/2015 6:00:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/15/2014
Control Number
2014-053
Agenda Item Number
8.J.
Entity Name
Carter Associates, Inc.
Subject
Work Order No.1
Intersection Improvements
Area
41st Street and US Highway No. 1
Project Number
1359
Bid Number
1333 2013-2014
Supplemental fields
SmeadsoftID
13086
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners <br />Administration - Building A <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />Project: <br />41st Street and U.S. Highway No. 1- Intersection Improvements <br />Right -of -Way and Topographic Survey <br />Indian River County Project No. 1359 <br />WORK ORDER NO. 1 (Engineering/Surveying) <br />FOR <br />PROFESSIONAL SERVICES AGREEMENT <br />ANNUAL SURVEYING and MAPPING SERVICES <br />WITH <br />Carter Associates, Inc. <br />In accordance with Contract No. 1333 2013-2014 <br />bk4/ ►5l ►y <br />3 <br />This Work Order No. 1 is in accordance with the existing AGREEMENT dated October 1, 2013 <br />between Carter Associates, Inc., (SURVEYOR) and Indian River County (COUNTY): <br />S ECTION I — PROJECT LIMITS <br />This Work Order No. 1 is for the SURVEYOR to perform all related field and office surveying <br />and mapping services in connection with the Right -of -Way and Topographic Survey of a portion <br />of 41st Street and U.S. Highway No. 1 including the intersection of 41st Street and Old Dixie <br />H ighway and the intersection of 41st Street and U S. Highway No. 1. The survey will extend <br />approximately 1,100 north, south and west of the intersection of Old Dixie Highway. <br />S ECTION II - SCOPE OF SERVICES <br />As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide <br />P rofessional Land Surveying services to complete all tasks as outlined in this Work Order No. 1; <br />specifically detailed in the attached proposal Exhibit A <br />S ECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a. 100% `Paper" review submittal (final review prior to request for final deliverables) <br />shall be made within 45 calendar days of receipt of Notice to Proceed for review by <br />County Staff prior to preparing the final submittal package. <br />b. Time of FINAL project completion shall be within 10 calendar days of receipt of the <br />County s review comments from the 100% "Paper Submittal". <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1359 41st St_US1 Left Turn Lane\Admin\agenda items\IRC CARTER WO No. 1 04-15-14.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.