Laserfiche WebLink
4.) Observe and record the existing limits of vegetation within the project limits and 20 feet outside of right of <br />way. <br />5.) Establish and set vertical benchmarks along the topographic route right of way survey not to exceed 600 <br />feet. <br />6.) The route survey to be tied into the record U.S. Highway no.1 right of way and Old Dixie Highway baseline. <br />7) Limited web search of the Indian River County property appraiser's tax role and clerk of the circuit court <br />records <br />Specific Notes: <br />Method of horizontal and vertical observations by G.P.S., RTK [accuracy: horizontal 10mm+1ppm (RMS), <br />vertical 20mm+1 ppm (RMS)], North American Datum of 1983 / Adjustment of 2007, Florida State Plane <br />Coordinates (East Zone -901) and North American Vertical Datum of 1988. <br />Project Schedule: <br />If required - Indian River County Surveying Division will coordinate and/or notify adjacent parcel owners along <br />the specific route of the possible commencement dates of survey services and, if necessary, the possible <br />access by the contractor to the respective adjacent parcels to perform their duties. <br />Deliverables: <br />FINAL — Five (5) paper "hardcopy" signed and sealed set. Sheeted and model space (as applicable) AutoCAD <br />drawing file and PDF formats on CD <br />Survey set/sheets shall include a cover sheet with location sketch, survey certifications, and related title and <br />project number; survey notes/legend/abbreviation sheet, and right-of-way plan view sheets. <br />Compensation: <br />Payments shall be in accordance with the original Professional Surveying and Mapping/GIS <br />Services Agreement, Contract No. 1333 with the Indian River County. <br />Field and office tasks: horizontal and vertical control for the IRC Topographic Right of Way <br />P roject No. ; Set vertical control monuments along the project route survey. Tie project <br />route to Florida State Plane Coordinate System (NAD 83/2007) and North American Vertical <br />D atum of 1988. <br />Surveyor I <br />2 hours @ $140.00/hr $ 280.00 <br />Surveyor II <br />4 hours @ $125.00/hr $ 500.00 <br />G PS RTK Survey Crew (2 Men / 2 Unit) <br />16 hours @ $120..00/hr $ 1.920.00 <br />Total I $ 2,700.00 <br />J:\SURVEY WORK AUTHORIZATIONS\IRC Survey 2013-2014\1/1-272S_IRC_WO_4lstreet Topo-ROW(USI west 1100feet).doc <br />30F6 <br />