Laserfiche WebLink
Subtask 2.1- Financial Assurance Report <br />CDM Smith will prepare documentation that demonstrates proof of financial assurance for the cost <br />of closing and providing long-term care for the Class I landfill, the C&D debris landfill, and the <br />Waste Tire Processing Center. This documentation will be submitted for review by the SWDD and <br />IRC Finance Department. Two copies of the final document will be provided to SWDD. CDM Smith <br />will meet with SWDD up to four times to discuss issues and to provide needed coordination. CDM <br />Smith will also respond to FDEP correspondence regarding financial assurance. <br />Subtask 2.2 - Survey and Airspace Assessment <br />CDM Smith will provide surveys and assessments of consumed airspace, performed by Masteller, <br />Moler, Reed & Taylor, Inc. for the Class I and C&D Landfills. The survey work for the Class I waste <br />area will include a complete topographic survey of Segments I, II, and III as well as the ditches and <br />roadways surrounding the Class I area. The topographic survey of the C&D debris landfill site will <br />include the waste area, as well as the fence -line and the surrounding ditches and berms adjacent to <br />the C&D debris site. CDM Smith will review the volumetric modeling and include a summary of <br />estimated waste density based on the results of the survey and volumetric modeling. <br />Under this subtask, two new aerial targets will be installed to replace those that were demolished <br />due to construction activities. The new aerial targets will consist of concrete pads 3 -inches thick <br />and 4 -inch X 4 -inch square with a set nail and disk in the center to establish horizontal and v <br />The deliverable from Masteller Moler, Reed & Taylor, Inc. will consist of a survey identifying the <br />dates the field survey was completed Airspace consumed and remaining airspace based on the <br />survey and the construction and design criteria shall be specifically identified in the financial <br />assurance report. The survey shall also include the results of the volumetric calculations for the <br />Segment II portions of the Class I landfill, as well as the C&D debris landfill. Deliverables <br />accompanying the survey shall include: <br />A 1 -inch = 50 feet scale contour map for each site with 1 -foot contour intervals in regular weight <br />lines, and 5 -foot contour intervals in bold weight lines. Signed and sealed contour maps will be <br />provided on 24 -inch by 36 -inch paper of each landfill site in 1 -inch = 200 feet scale. A Compact Disc <br />(CD) with ASCII file of the survey data in AutoCAD 2004 will also be provided. <br />For the Class I Landfill (Segment I, II, and III), the financial assurance report shall include an <br />evaluation of the compaction of the waste and an analysis as to whether Republic Services is <br />meeting its contractual compaction requirements. CDM Smith will include escrow account balance <br />recommendations for Fiscal Year 2013-2014, as well as escrow account budget recommendations <br />for Fiscal Year 2014-2015. <br />A-2 <br />0380_W09.docx <br />